Defining the search criteria for CUM required history
Use the CUM Required History page to specify the search criteria for the CUM required history details of the part that are displayed on the CUM Required History List page.
To define the search criteria:
- Select Demand > CUM Management > CUM Required History. The CUM Required History Search Criteria page is displayed.
-
Specify this information:
- Facility
- The name of the location from where the demand for the parts is raised.
- Ship To
- The location at which the parts are received.
- Ship From
- The name of the location from where the parts are shipped.
- Part
- The code of the part.
- PO Number
- The purchase order (PO) number associated with the requirement.
- Document Type
- The type of schedule.
Possible values:
- Material Release
- Shipping Schedule
- From (Date)
- The date from which the schedules with modified CUM Required are displayed.
- To (Date)
- The date up to which the schedules with modified CUM Required are displayed.
- Click Continue. The CUM Required History List page is displayed.
Related topics