SC001 |
Check the validity of each of the
module hierarchy selections. Modules that are not selected are flagged.
Or, if a previously selected location hierarchy is deleted, the
selection is no longer valid and the value is NULL in the Cycles page and is flagged. |
Warning |
Cycle period [cycle]-[period] with the
[module] module and the required fields, which are not completed. The
[module] module is unavailable. |
SC004 |
Check for a calendar selection in the cycle period.
If the user deletes the calendar that is defined in the cycle, the
selection is no longer NULL and is flagged .
|
Incomplete |
Cycle [cycle] with no Calendar
defined. |
SC005 |
Check for a calendar level to store
the scenario values in the cycle period. If the user updates the
selected calendar, the level selection can be invalid. For example, the
removal of the quarters from the selected calendar can generate an
error, if the quarters are the default calendar level. The selection is
no longer valid and the value is NULL. |
Incomplete |
Cycle [cycle] with no Calendar level
defined. |
SC007 |
Check for an item hierarchy in the
cycle period. If the user deletes the selected item hierarchy, the
selection in Cycles is no longer
valid and the selection is marked NULL. |
Incomplete |
Cycle period [cycle]-[period] with no
Item Hierarchy defined. |
SC008 |
Check for an item hierarchy level to
store scenario values in the cycle period. If the user updates the
selected item hierarchy, the selection can be invalid. For example, the
removal of a level from the selected hierarchy can generate an error.
The selection is no longer valid and is marked NULL . |
Incomplete |
Cycle period [cycle]-[period] with no
Item Hierarchy level defined. |
SC009 |
Check for a base currency in the
cycle period. If the currency from MDM is deleted, the selection in
Cycles is no longer valid and
the selection is marked NULL. |
Incomplete |
Cycle period [cycle]-[period] with no
Base Currency defined. |
SC040 |
Check for a periodicity selection. If
the user updates the selected calendar, the level selection can be
invalid. For example, the removal of the quarters from the selected
calendar can generate an error, if quarters are the periodicity setting
for this cycle. The selection is no longer valid and is marked NULL,
which leads to this error. |
Incomplete |
Cycle [cycle] with no periodicity
defined. |
SC041 |
Check for a cycle process selection.
If the user deletes the selected cycle process, the selection is no
longer valid and is marked NULL. The cycle can be created successfully
without a process definition, but data is blank and can differ from the
expected result, if a process is previously defined. |
Warning |
Cycle period [cycle]-[period] with no
cycle process defined. |
SC042 |
Check the validity of the scenario
process selection, for each default scenario. If the user deletes the
selected scenario process, the selection is no longer valid and is
marked NULL. As the default scenarios are versioned, at the time of
creating a cycle period (not starting), this check must be made against
the cycle definition and the creation of a new cycle period must be
prevented. |
Incomplete |
Cycle [cycle] with a default scenario
[scenario] and no scenario process defined. |
SC043 |
Check the validity of the
initialization macro selection for each default scenario. It the macro
is deleted, the selection is no longer valid and is marked NULL. The
status is set to Warning, because the scenario is successfully created
without a workflow, but may differ from the expected result if a
workflow is previously defined. |
Warning |
Cycle period [cycle]-[period] with a
default scenario [scenario], and no initialization macro defined.
|
SC045 |
Check for an update of the cycle
definition for the version linked to the current cycle period. |
Updated |
Cycle differs from the version used in
Cycle Period [cycle] - [period]. Updates are effective from the start of
the next Cycle Period. |
SC047 |
|
Updated |
Calendar [calendar] differs from the
version used in Cycle Period [cycle] - [period]. Updates are effective
from the start of the next Cycle Period. Check for an update of the calendar
for the version linked to the current cycle period, where applicable. |
SC048 |
Check for an update of the measure for
the version linked to the current cycle period. |
Updated |
Measure [measure] differs from the
version used in Cycle Period [cycle] - [period]. Updates are effective
from the start of the next Cycle Period. |
SC049 |
Check for an update of the calculation
rule for the version linked to the current cycle period. |
Updated |
Check for an update of the calendarCalendar Rule [rule] differs from the
version used in Cycle Period [cycle] - [period]. Updates are effective
from the start of the next Cycle Period. |
SC050 |
Check for an update of the note type
for the version linked to the current cycle period. |
Updated |
Note Type [type] differs from the
version used in Cycle Period [cycle] - [period]. Updates are effective
from the start of the next Cycle Period. |
SC051 |
Check for an update of the planning
hierarchy for the version linked to the current cycle period, where
applicable. |
Updated |
Planning Hierarchy [hierarchy]
differs from the version used in Cycle Period [cycle] - [period].
Updates are effective from the start of the next Cycle Period. |
SC052 |
Check for an update of the cycle
process for the version linked to the current cycle period, where
applicable. |
Updated |
Cycle Process [process] differs from
the version used in Cycle Period [cycle] - [period]. Updates are
effective from the start of the next Cycle Period. |
SC053 |
Check for an update of the workflow
for the version linked to the current cycle period, where applicable. |
Updated |
Workflow [workflow] differs from the
version used in Cycle Period [cycle] - [period]. Updates are effective
from the start of the next Cycle Period. |
SC074 |
Check that the cycle is set up to
start automatically (Process is Started > Manually), but the Next Period field is empty (NULL).
In this case, the application cannot automatically create periods for
this cycle because the period that must be started cannot be determined.
The user must edit the cycle definition and set a valid Next Period value
or set Process is
Started to Manually. |
Warning |
Cycle [cycle] with the automatic
'Process is Started' setting, however the Next Period is not determined.
No new cycle periods are started by the system until the Next Period is
populated with a period value. (Configuration \ Cycle). If automatic
creation of new cycle periods is not required set 'Process is Started' =
Manually. |
SC075 |
Check the status of the calendar in
Cycles. If the status is
Invalid due to a failure during the creation of calendar buckets, an
issue is raised. |
Incomplete |
Cycle period [cycle]-[period] is
using calendar [calendar] with a status = "Invalid". Revise the calendar
definition and correct the problem before starting the cycle period.
|
SC077 |
Check for new calendar definitions
against the version used in the current cycle period. The message is
only generated for cycles with the status = Running (not Aborted,
Completed, Pending). |
Updated |
Calendar [calendar] is added during
the current cycle period. These changes are effective from the next
Cycle Period. |
SC078 |
Check for new measure definitions
against the version used in the current cycle period. The message is
only generated for cycles with the status = Running (not Aborted,
Completed, Pending). |
Updated |
Measure [measure] is added during the
current cycle period. These changes are effective from the next Cycle
Period. |
SC079 |
Check for new calculation rules
against the version used in the current cycle period. The message is
only generated for cycles with the status = Running (not Aborted,
Completed, Pending). |
Updated |
Calculation Rule [rule] is added
during the current cycle period. These changes are effective from the
next Cycle Period. |
SC080 |
Check for new planning hierarchy
definitions against the version used in the current cycle period. The
message is only generated for cycles with the status = Running (not
Aborted, Completed, Pending). |
Updated |
Planning Hierarchy [hierarchy] is
added during the current cycle period. These changes are effective from
the next Cycle Period. |
SC081 |
Check for new cycle process
definitions against the version used in the current cycle period. The
message is only generated for cycles with the status = Running (not
Aborted, Completed, Pending). |
Updated |
Cycle Process [process] is added
during the current cycle period. These changes are effective from the
next Cycle Period. |
SC082 |
Check for new scenario process
definitions against the version used in the current cycle period. The
message is only generated for cycles with the status = Running (not
Aborted, Completed, Pending). |
Updated |
Scenario Process [process] is added
during the current cycle period. These changes are effective from the
next Cycle Period |
SC083 |
Check for deleted cycle definitions
against the version used in the current cycle period. This only applies
to the deleted cycle. |
Updated |
Cycle Definition [cycle] is deleted
during the current cycle period. These changes are effective from the
next Cycle Period. |
SC084 |
Check for deleted calendar
definitions against the version used in the current cycle period. The
message is only generated for cycles with the status = Running (not
Aborted, Completed, Pending). |
Updated |
Calendar [calendar] is deleted during
the current cycle period. These changes are effective from the next
Cycle Period. |
SC085 |
Check for deleted measure definitions
against the version used in the current cycle period. The message is
only generated for cycles with the status = Running (not Aborted,
Completed, Pending). |
Updated |
Measure [measure] is deleted during
the current cycle period. These changes are effective from the next
Cycle Period. |
SC086 |
Check for deleted calculation rules
against the version used in the current cycle period. The message is
only generated for cycles with the status = Running (not Aborted,
Completed, Pending). |
Updated |
Calculation Rule [rule] is deleted
during the current cycle period. These changes are effective from the
next Cycle Period. |
SC087 |
Check for deleted planning hierarchy
definitions against the version used in the current cycle period. The
message is only generated for cycles with the status = Running (not
Aborted, Completed, Pending). |
Updated |
Planning Hierarchy [hierarchy] is
deleted during the current cycle period. These changes are effective
from the next Cycle Period. |
SC088 |
Check for deleted cycle process
definitions against the version used in the current cycle period.
Message is only generated for cycles with the status = Running (not
Aborted, Completed, Pending). |
Updated |
Cycle Process [process] is deleted
during the current cycle period. These changes are effective from the
next Cycle Period. |
SC089 |
Check for deleted scenario process
definitions against the version used in the current cycle period. The
message is only generated for cycles with the status = Running (not
Aborted, Completed, Pending). |
Updated |
Scenario Process [process] is deleted
during the current cycle period. These changes are effective from the
next Cycle Period. |
SC096 |
Check the cycle process linked to a
cycle. If a cycle process setup is invalid, the start of the cycle
period is prevented. |
Incomplete |
Cycle [cycle] using cycle process
[cycle process] with an invalid setup. Revise the cycle process and
rectify before the creation of a new cycle period for this cycle.
|
SC098 |
Check the planning hierarchies linked
to a cycle. If a planning hierarchy setup is invalid, the start of the
cycle period is prevented. |
Incomplete |
Cycle using hierarchy "{0}" with a
status = "Invalid". Revise the hierarchy and rectify before starting the
cycle period. |
SC101 |
Check the code lists used for
planning hierarchies in a cycle period. If a code list setup is invalid,
the start of the cycle period is prevented. |
Incomplete |
Cycle period [cycle]-[period] is
using a planning hierarchy [hierarchy] based on Code List [code list]
setup is invalid. Revise the Code List and rectify before starting the
cycle period. |
SC102 |
A module defined in Cycles does not contain measures. This
prevents the creation of the measure dimension in the cube, causing
problems. At least one measure must be defined for each module. |
Incomplete |
Cycle period [cycle]-[period]
contains a module [module] that does not have measures defined. Disable
this module in the Cycle, or define at least one measure for this
module. |
SC103 |
The additional planning hierarchy
definitions must be complete. If a planning hierarchy that is in use by
a cycle as an additional hierarchy is deleted, this leads to an
incomplete definition. |
Incomplete |
Cycle period [cycle]-[period] with an
incomplete additional planning hierarchy definition for module [module].
|
SC104 |
The additional pivot attribute
definitions must be complete. If a code list or code list attribute is
deleted that is in use by a cycle as an additional pivot attribute, this
leads to an incomplete definition. |
Incomplete |
Cycle period [cycle]-[period] with an
incomplete additional pivot attribute for [Description]. |
SC105 |
The previous cycle period must be
valid prior to starting a cycle period, based on all valid completed
cycle periods. |
Incomplete |
Cycle period [cycle]-[period] with an
invalid cycle period selected previously. |
SC106 |
If the cycle process is set to start
automatically, check that the previous cycle period can be calculated. |
Warning |
Cycle period [cycle]-[period] with an
automatic 'Process is Started' setting. However, the previous cycle
period cannot be calculated. |
SC107 |
If an additional Pivot Attribute is
defined in the cycle, all elements of the selected code list must be
populated for that attribute. If a null value exists for any element in
the corresponding code list, the cube is not populated correctly. |
Incomplete |
Cycle period [cycle]-[period] with an
additional pivot attribute defined [code list].[attribute], which
contains undefined values for elements within the code list. All code
list elements must be populated for this to be a valid additional pivot
attribute for this cycle. |
SC108 |
Check the note type for a mandatory
note during unlock and save changes. If a note type that is in use by a
cycle is deleted, this leads to an incomplete definition. |
Incomplete |
Cycle period [cycle]-[period] with
the Force Add Note on Unlock selected but no valid Default Note Type
selected. Select a new note type or clear the Force Add Note on Unlock
option |
SC109 |
Check the note type for a mandatory
note during worksheet recalculation. If a note type that is in use by a
cycle is deleted, this leads to an incomplete definition. |
Incomplete |
Cycle period [cycle]-[period] with
the Force Add Note on Recalculate selected but no valid Default Note
Type selected. Select a new note type or clear the Force Add Note on Recalculate
option |
SC124 |
Check the measures that are used in a
cycle. If the setup for the measure is invalid, the start of the cycle
period is prevented. |
Incomplete |
Cycle period [cycle]-[period] is
using a measure [measure] with an invalid setup. Revise the measure and
correct the problem before starting the cycle period. |
SC125 |
Check the calculation rules that are
used in a cycle. If the calculation rule setup is invalid, the start of
the cycle period is prevented. |
Incomplete |
Cycle period [cycle]-[period] is
using a calculation rule [rule] with an invalid setup. Revise the
calculation rule and correct the problem before starting the cycle
period. |
SC126 |
Check to ensure that the location
hierarchy selection for each module is a planning hierarchy with defined
levels, as the bottom level of each module's location hierarchy is used
as the level to store scenario values. |
Incomplete |
Cycle period [cycle]-[period] is
using a location hierarchy [hierarchy] with no levels defined. Revise
the location hierarchy selection for module [module] and correct the
problem before starting the cycle period |
SC127 |
Verify that at least one module
hierarchy is selected for a cycle. |
Incomplete |
Cycle "{0}" with no location
hierarchies defined. Define a location hierarchy for at least one
module. |
SC128 |
Verify that the cycle has a valid
combination of modules (location hierarchies selected). If a planning
hierarchy is removed, the combination of modules can become invalid for
a cycle. |
Incomplete |
Cycle has an invalid planning
hierarchy selection of ("{0}", "{1}", "{2}", "{3}"). Revise the cycle
and select location hierarchies for a valid combination of modules.
|
SC131 |
Check to ensure that any additional
pivot attributes that are defined against the cycle do not contain
values longer than 71 characters. |
Incomplete |
Cycle [cycle] with an additional
pivot attribute defined [code list].[attribute], which contains elements
greater than 71 characters. Modify each element to be not more than 71
characters for this attribute. |
SC135 |
Create a set in the OLAP dimensions
that corresponds to each level in the planning hierarchies used by a
cycle, using Set and the level name (for example, Set_Level4Items). You
must check if all the hierarchies for a dimension have a unique level
name, wherein the code list differs. A same code list and level name can
be used because you create the set for a unique code list. Level1 of a
hierarchy is not checked as this contains a single element (no Set
required). |
Incomplete |
Cycle has {0} hierarchies "{1}" with
a non-unique level "{2}" that does not validate the {3} data cube. Edit
the hierarchies to make all non-root levels unique. |
SC139 |
Check if all the node/level names
referenced by business metrics are valid when the cycle period is
started/resumed. |
Incomplete |
Cycle contains a business metric
"{0}" which refers to invalid "{1}" with names: "{2}" |
SC140 |
Check additional hierarchies in
comparison with the cycle hierarchies that do not have levels shared
with the primary hierarchy, above the base level, and are not in
sequence (consecutive) from the base level and higher. |
Incomplete |
Cycle includes hierarchies "{0},
{1}" with shared elements which are non-consecutive from the base level
upwards. For shared elements, the child levels must also be shared in
both hierarchies up to the base level. ({2}) |
SC141 |
Check additional hierarchies defined
in comparison with the cycle hierarchies that have the same parent
definitions for any shared levels. Different hierarchies can have
different parent attributes and therefore, parent-child associations.
Primary and Additional hierarchies in the Cycle with different
parent-child relations for the shared levels are not allowed. The top
shared level can have a different parent. |
Incomplete |
Cycle includes hierarchies "{0},
{1}" with shared elements on two or more levels; however some shared
child levels are linked to different parent levels in the two
hierarchies. ({2}) |
SC142 |
Check if any additional location
hierarchies have a suitable primary location hierarchy defined for the
specified module. There is no restriction on defining an additional
hierarchy within any module. |
Warning |
Cycle with an additional hierarchy
"{0}" of type location for module {1}, although the correspondent
primary hierarchy is not defined. This additional hierarchy is ignored.
|
SC143 |
Check additional hierarchies to
ensure that the root node is not the same as the primary hierarchy.
Hierarchies can share levels from the base. However, the root node must
be different. |
Incomplete |
Cycle includes hierarchies "{0},
{1}" with shared elements which are non-consecutive from the base level
upwards. For shared elements, the child levels must also be shared in
both hierarchies up to the base level. ({2}) |
SC145 |
Check that each rolling period
definition contains a calendar that is valid for the current cycle,
based on the primary calendar or additional period hierarchies. |
Incomplete |
Cycle "{0}" with a Rolling Period
"{1}" which uses a calendar that does not match either the primary
calendar "{2}" or any calendars referenced in additional planning
hierarchies "{3}". |
SC146 |
Check that each rolling period
definition is linked to a valid periodicity selection, based on the
cycle periodicity and calendar level, to store scenario values. The
selected periodicity must be between these ranges. |
Incomplete |
Cycle "{0}" with a Rolling Period
"{1}" and a periodicity below "{2}". |
SC147 |
Validate that all nodes between all
period hierarchies defined for the cycle level are unique (except the
shared bottom level). |
Incomplete |
Cycle with period hierarchies "{0}"
which contain a non-unique node "{1}" that does not validate the {2}
data cube. |
SC149 |
Check business metrics for the cycle
to ensure that the base measure is also enabled for this cycle. |
Warning |
Cycle has a business metric "{0}"
which references a measure "{1}" that is not enabled for the cycle.
|
SC150 |
Check whether the current planning
period can be defined. |
Incomplete |
Cycle Period "{0}" with no available
planning periods. |
SC151 |
Check whether each forecast engine is
linked to a default parameter code list. This is required for each
forecast engine defined, however, if the user deletes the code list
defined in the forecast engine, the selection is no longer valid and is
marked NULL and flagged. |
Warning |
Forecast engine {0} with no default
parameter code list defined. |
SC152 |
|
|
Calculation rule with module {0} and
calculation sequence {1} with neither Filter nor Measure defined.
|
SC153 |
|
|
Planning hierarchy "{0}" with a
status = "Building". The processes for the hierarchy must be executed
prior to starting a new cycle period. |
SC154 |
|
|
Calendar "{0}" with a status =
"Building". The processes for the calendar must be executed prior to
starting a new cycle period. |
SC163 |
Check whether the macros defined within the
initialization macro are correctly tagged for the Cycle. In this
situation the macro is not executed upon start of a cycle
period. |
Warning |
Cycle has default scenario " {0}" whose initialization
macro is not enabled for the cycle with tags. |
SC164 |
Check whether a Market Intelligence
record for which the tag is set to enabled in a cycle, references any
measures for which tags are not enabled for the same cycle. In this
situation, the MI record is invalid and is not created at the start of a
cycle period. |
Warning |
Cycle has an enabled Market
Intelligence {0} which references measures {1,2,3 ...} that are not
enabled for the cycle. Enable the relevant tags in the Cycle
Configuration window. |
SC165 |
Check whether multiple MI records
using the same measure/module are set to enabled for the same cycle. In
this situation, the MI records are invalid and are not created at the
start of a cycle period. |
Warning |
Cycle has more than one enabled
Market Intelligence record for module "{0}" using the same measure "{1}
|
SC166 |
Check whether multiple enabled MI
records with the same Net Forecast Measure are set to Edit Net Forecast
Directly. The Net Forecast Measure can only be edited directly in one MI
record. In this situation, the MI records are invalid and are not
created at the start of a cycle period. |
Warning |
Cycle has more than one enabled
Market Intelligence record for module "{0}" using the same Net Forecast
Measure "{1} set to Edit Net Forecast Directly. |
SC168 |
Check whether a calculation rule is
based on a measure which is defined as a Market Intelligence record. In
this situation, the calculation rule is invalid and is not created a the
start of a cycle period. |
Warning |
Cycle has an enabled Calculation rule
{0} which is based on a measure {1} that is defined as a Market
Intelligence record. Update the Calculation rule accordingly. |
SC169 |
Check whether a calculation rule is
based on a measure which is defined as a Transactional Data record and
both are enabled for the same cycle. In this situation, the calculation
rule is invalid and is not created at the start of a cycle
period. |
Warning |
Cycle has an enabled Calculation rule
{0} which is based on a measure {1} that is defined as a Transactional
Data record. Update the Calculation rule accordingly. |
SC170 |
Check whether a measure is defined as
a Transactional Data record and is enabled in a cycle, which also is
defined as a Market Intelligence record and enabled for the same cycle.
In this situation, the measure is invalid and the configuration cannot
be completed. |
Incomplete |
Cycle has an enabled measure {0}
which is defined as a Transactional Data record and a Market
Intelligence record. Measure can only be used in one definition. |
SC176 |
If a Replenishment Engine is defined,
check that the engine is enabled for the cycle. If the engine is not
enabled, the engine is not available for selection for the
cycle. |
Warning |
Cycle has a Replenishment Engine {0}
which is not enabled for the cycle. |
SC199 |
Check whether the macro defined as the initialization
macro is enabled or accessible to users. Else, the macro is not executed
upon start of the cycle period. |
Warning |
Cycle has default scenario "{0}" with an
Initialization macro {1} which is not enabled or user does not have
access. |