Production details from Resource

A new worksheet Production Detail from Resource is added. The worksheet uses item context based on a process (typically Item Process at Resource Location) and displays all production for that process.

Previously, users drill through from a Resource to view the capacity used and the total production hours, although unable to view the breakdown (for example, firm vs. planned). The worksheet resolves that limitation.

The worksheet displays all populated production measures for the passed context, including bucketed and transactional data (order) measures.

The new worksheet is not loaded by default, however is accessible as a panel in these existing multi-panel worksheets:

  • Planning Interrogation. Accessed from Resource Production Detail
  • Production Plan Review. Accessed from Production Hours
Note: This feature is available after loading the supply planning (spls.zip) template for this version. You are not required a new role or privilege access to use this feature. This feature is accessible to those users with access to the multi-panel worksheets mentioned above.