Utilities graph
Use the Utilities Graph panel to view utilities that are required for production. This graph displays the available capacity and updates in real-time when there is a schedule change. The production is based on the scheduled batches, utility requirements, workers required to operate the resources, and the shift times defined in the time period. The Utilities Graph panel is displayed when you click the option on the toolbar.
Note: The option is displayed only if the utilities graph is configured for a production view.
This information is displayed in the Utilities Graph panel:
- Title
- The name of the utilities graph.
- X-Axis
- The timeline that is aligned with the time axis.
- Y-Axis
- The capacity levels of the selected utility.
- Lines
- The required utility levels for the scheduled production.
This information is displayed in a tooltip when you hover over the line in the graph:
- Utility code
- Timestamp
- Scheduled utility level
- Available utility level
You can also perform these actions in the Utilities Graph panel:
- Filter the graph based on the utility code or the utility type using the search field.
- Customize the panel height by dragging the top of the panel.
- Download the graph as a pdf format using the option from the ellipsis menu.
- Filter the graph by related batches, using the Note:
- By default, this switch is set to Off.
- The count of related batches for the currently selected utility is displayed on the switch label.
- If this switch is set to On:
- The related batches for the highlighted utility are selected on the planning board.
- If the batch list is open, the selected batches are grouped by the resource group and the Group by list menu is disabled.
- If this switch is set to Off:
- Related batches are no longer highlighted on the planning board.
- If the batch list is open, the previous grouping selection is retained.
switch.