Select a type of utility required from the type list.
Note: You can also specify a new code.
Select the unit of measure for the utility.
Specify a maximum and minimum claim and a claim increment.
Select the is critical check box to include this utility when utilities are included in a solver. In addition, critical utilities are indicated on the planning board with a bold red line.
Select the check schedule check box if this utility is to be verified when you run the Check schedule function.