Production Capacity Issues
Process nodes are highlighted based on the maximum value of the Load of class Resources,
across all used production resource(s) and Planning Horizon periods.
Process nodes are highlighted as follows when collapsed:
- If the maximum load is greater than or equal to 100.005%, the Process node icon is changed to a red error icon.
- If the maximum load is greater than or equal to 90%, or less than 100.005%, the Process node icon is changed to an amber warning icon.
- If the maximum load is less than 90%, the color of the process node does not change.
Process nodes are highlighted as follows when expanded:
- If the maximum load is greater than or equal to 100.005%, an error
icon is added to the Process node icon, and the node is changed to red.Note: When you hover over a red process node, a message is displayed in the tooltip with an error icon, indicating that the load limit has been exceeded.
- If the maximum load is greater than or equal to 90%, or less than
100.005%, a warning icon is added to the Process node, and the
whole node is changed to amber. Note: When you hover over an amber process node, a message is displayed in the tooltip with a warning icon, indicating that the load limit is reached.
- If the maximum load is less than 90%, the color of the process node does not change.
The Production Capacity Issues item is added to the legend, which displays the count of highlighted process nodes within parentheses.