Utilities graph

You can add the utilities graph to the selected panel using the Utilities graph switch in the Details section. You can configure and apply searches to the utilities graph after enabling the graph.

Note: You can enable only one utilities graph for each view. When you enable the Utilities graph switch, the switch is locked in other panels. However, you can modify the configuration of the graph from other panels. You can only disable the utilities graph from the panel where the Utilities graph switch is enabled.

You can use the Utility parameter when you enable the utilities graph for the selected panel. This parameter enables you to specify which utility requirement to be displayed when opening the view. If you select a utility, the selection requirement is displayed on the card preview.

The Utilities graph switch is enabled on the toolbar of the Planning Board when you configure the utility graph. You can use this switch to display the utility graph at the bottom of the Planning Board.

Note: 
  • If the graph is configured with the Utilities parameter set to All, the graph displays all utilities in the model.
  • If the graph is configured to a specific utility, only that utility is displayed in the graph. The Search list menu and Search field are not displayed.