Editing Plan Data
A Standard Plan Data plansheet is opened in an editable mode only if you have the
permission to modify the plansheet data (Planning Engine – Save or Discard changes). You can
only modify the atomic values in the plansheet and these values are underlined. The cells that
have been modified are marked with a dirty flag. The revised atomic values are saved and the
plansheet data is updated when you save the plansheet.
You can use the Discard Edits option to discard the changes made to the Plansheet.