Planning Engine read actions
You can perform these read actions for a planning engine:
- Open or refresh Plansheets
- Open Variables on the Planning Engine Detail
- Execute an Export
- Backup
These are the rules while performing read actions:
- Multiple read actions can be performed simultaneously. However, read actions cannot be performed when an update action is running for the same Planning Engine.
- When a read action is performed while a update action is in progress, the read action
waits up to 30 seconds for the update action to complete. Possible scenarios:
- If the update action completes within the 30 seconds, the read action initiates the execution.
- If the update action is in progress after 30 seconds, the read action fails, and this
error message is displayed:
RTPR007 = Attempting to access planning engine details. An update is ongoing, try again later.
- Read actions can be performed simultaneously with a workflow containing update actions, if the update action step is not being executed.