Routing Quantity tab

You must specify this information in the Routing Quantity tab.
Process Changes to Routing Quantity
Determines, if the difference in effective from/to quantity for a routing is considered. Possible values:
  • On: If there are differences in effective from/to quantity for a routing that produce the same product at the same location with the same effective dates, create a new routing based on each variation. The Routing Version field is populated with the definition from the ‘New Version value’ field sets.
  • Off: The differences in quantity for a routing that produce the same product is not considered.
Value
The value to be used if output items change. This value is generated during the execution of the transformation program. When new routings are created, this value is added to the SC_ROUTING_VERSION column.
Note: 
  • The default value is QTY.
  • This field is enabled if the Process Changes to Routing Quantity field is set to On and the Add Global Sequence Number field (Routing Details tab) is set to Off.
Column
The name of column in the SC_ROUTING table which appends the value from the specified column to the value in the New Value field. The value is generated during execution of the transformation program.
Note: 
  • The default value is set to null that means column value is not added.
  • This field is enabled if the Process Changes to Routing Quantity field is set to On and the Add Global Sequence Number field (Routing Details tab) is set to Off.
Sequence Number Length
The length of a sequence number. This sequence number appends to the value in the Value field. The value is generated during execution of the transformation program.
Note: 
  • The default value is 1.
  • If this value is 0, sequence number is not added.
  • This field is enabled if the Process Changes to Routing Quantity field is set to On and the Add Global Sequence Number field (Routing Details tab) is set to Off.