Routing Output Item tab
You must specify this information in the Routing Output Item tab.
- Process Change to Routing Input Items
- Determines, if the difference in the output items for a routing is considered. Possible
values:
- On: If there are differences in the output items for a routing that produce the same product at the same location with the same effective dates, a new routing is created based on each variation. The Routing Version field is populated with the definition from the ‘New Version value’ field sets.
- Off: The differences in output items for a routing that produce the same product are not considered.
- Value
- The value to be used if output items change. This value is generated during the
execution of the transformation program. When new routings are created, this value is
populated in the SC_ROUTING_VERSION column.Note:
- The default value is OUT.
- This field is enabled if the Process Changes to Routing Output Items field is set to On and theAdd Global Sequence Number field (Routing Details tab) is set to Off.
- Column
- The name of the column in the SC_ROUTING_OUTPUT_ITEM table which appends value from the
specified column to the value in the Value field. The value is generated during the execution of the
transformation program.Note:
- The default value is set to null that means column value is not added.
- This field is enabled if the Process Changes to Routing Output Items field is set to On and theAdd Global Sequence Number field (Routing Details tab) is set to Off.
- Sequence Number Length
- The length of a sequence number. This sequence number is appended to the value in the
Value field. The value is generated during execution of the transformation program.Note:
- The default value is 1.
- If this value is 0, sequence number is not added.
- This field is enabled if the Process Changes to Routing Output Items field is set to On and theAdd Global Sequence Number field (Routing Details tab) is set to Off.