Routing Version tab
You must specify this information in the Routing
Version tab.
- Process Changes to Routing Quantity
- Determines, if the difference in Bill of Material (BOM) version for a routing is
considered. Possible values:
- On: If there are differences in the Bill of Material (BOM) version for a routing that produce the same product at the same location with the same effective dates, a new routing is created based on each variation. The Routing Version field is populated with the definition from the ‘New Version value’ field sets.
- Off: The differences in version for a routing that produce the same product are not considered.
- Value
- The value is used if output items change. This value is generated during the execution
of the transformation program. When new routings are created, this value is populated to
the SC_ROUTING_VERSION column.Note:
- The default value is VER.
- This field is enabled if the Process Changes to Routing Version field is set to On and the Add Global Sequence Number (Routing Details tab) field is set to Off.
- Column
- The name of the column in the SC_ROUTING table which appends the value from the
specified column to the value in the New
Value field. The value is generated during execution of the transformation
program.Note:
- The default value is set to null that means column value is not added.
- This field is enabled if the Process Changes to Routing Version field is set to On and the Add Global Sequence Number (Routing Details tab) field is set to Off.
- Sequence Number Length
- The length of a sequence number. This sequence number is appended to the value in the
Value field. The value is
generated during execution of the transformation program.Note:
- The default value is 1.
- If this is 0, sequence number is not added.
- This field is enabled if the Process Changes to Routing Version field is set to On and the Add Global Sequence Number (Routing Details tab) field is set to Off.