Routing Version tab

You must specify this information in the Routing Version tab.
Process Changes to Routing Quantity
Determines, if the difference in Bill of Material (BOM) version for a routing is considered. Possible values:
  • On: If there are differences in the Bill of Material (BOM) version for a routing that produce the same product at the same location with the same effective dates, a new routing is created based on each variation. The Routing Version field is populated with the definition from the ‘New Version value’ field sets.
  • Off: The differences in version for a routing that produce the same product are not considered.
Value
The value is used if output items change. This value is generated during the execution of the transformation program. When new routings are created, this value is populated to the SC_ROUTING_VERSION column.
Note: 
  • The default value is VER.
  • This field is enabled if the Process Changes to Routing Version field is set to On and the Add Global Sequence Number (Routing Details tab) field is set to Off.
Column
The name of the column in the SC_ROUTING table which appends the value from the specified column to the value in the New Value field. The value is generated during execution of the transformation program.
Note: 
  • The default value is set to null that means column value is not added.
  • This field is enabled if the Process Changes to Routing Version field is set to On and the Add Global Sequence Number (Routing Details tab) field is set to Off.
Sequence Number Length
The length of a sequence number. This sequence number is appended to the value in the Value field. The value is generated during execution of the transformation program.
Note: 
  • The default value is 1.
  • If this is 0, sequence number is not added.
  • This field is enabled if the Process Changes to Routing Version field is set to On and the Add Global Sequence Number (Routing Details tab) field is set to Off.