Defining cycles - Calendar tab

You must specify this information in the Calendar tab.
Calendar
The calendar (hierarchy) that is used by this cycle.
Calendar Level for Storing Scenario Values
The calendar level in which scenario plan data is reported. Possible values:
  • Years
  • Quarters
  • Months
  • Weeks
Note: If the Enable Telescopic option is set to On, this value is the parent level from which telescopic bucket can be generated.
Future Horizon
The number of periods in future (from the current planning period) used to store plans based on the calendar level.
Note: 
  • If the selected calendar hierarchy does not extend to include the required horizon for the created cycle period, the periods in future are created only within the hierarchy.
  • If the Enable topic option is set to On, this value is considered as the overall horizon size.
History Horizon
The number of history periods, prior to the current planning period, used to store plans based on the calendar level.
Note: 
  • If the selected calendar hierarchy does not extend to include to the required horizon for the created cycle period, the history periods are created only within the hierarchy.
  • If the Enable topic option is set to On, this value is considered as the overall horizon size.
Enable Telescopic
Allows the user to determine the levels within the calendar level for storing the required telescopic Scenario values
Note: 
  • By default, this value is set to Off.
  • If this option is set to On, Telescopic Levels table is displayed.
.