Setup checks and messages

The Setup Checker page displays the subsequent levels of check, based on the Configuration menu structure. To view a functional area's checks and messages, click the appropriate link:

These tables show the checks that are performed and the messages that can be displayed:

Cycle

Code Check Status Message
SC001 Check the validity of each of the module hierarchy selections. Modules that are not selected are flagged. Or, if a previously selected location hierarchy is deleted, the selection is no longer valid and the value is NULL in the Cycles page and is flagged. Warning Cycle period [cycle]-[period] with the [module] module and the required fields, which are not completed. The [module] module is unavailable. 
SC004

Check for a calendar selection in the cycle period. If the user deletes the calendar that is defined in the cycle, the selection is no longer NULL and is flagged.

Incomplete Cycle [cycle] with no Calendar defined.
SC005 Check for a calendar level to store the scenario values in the cycle period. If the user updates the selected calendar, the level selection can be invalid. For example, the removal of the quarters from the selected calendar can generate an error, if the quarters are the default calendar level. The selection is no longer valid and the value is NULL. Incomplete Cycle [cycle] with no Calendar level defined.
SC007 Check for an item hierarchy in the cycle period. If the user deletes the selected item hierarchy, the selection in Cycles is no longer valid and the selection is marked NULL. Incomplete Cycle period [cycle]-[period] with no Item Hierarchy defined.
SC008 Check for an item hierarchy level to store scenario values in the cycle period. If the user updates the selected item hierarchy, the selection can be invalid. For example, the removal of a level from the selected hierarchy can generate an error. The selection is no longer valid and is marked NULL. Incomplete Cycle period [cycle]-[period] with no Item Hierarchy level defined.
SC009 Check for a base currency  in the cycle period. If the currency from MDM is deleted, the selection in Cycles is no longer valid and the selection is marked NULL. Incomplete Cycle period [cycle]-[period] with no Base Currency defined.
SC040 Check for a periodicity selection. If the user updates the selected calendar, the level selection can be invalid. For example, the removal of the quarters from the selected calendar can generate an error, if quarters are the periodicity setting for this cycle. The selection is no longer valid and is marked NULL, which leads to this error. Incomplete Cycle [cycle] with no periodicity defined.
SC041 Check for a cycle process selection. If the user deletes the selected cycle process, the selection is no longer valid and is marked NULL. The cycle can be created successfully without a process definition, but data is blank and can differ from the expected result, if a process is previously defined. Warning Cycle period [cycle]-[period] with no cycle process defined.
SC042 Check the validity of the scenario process selection, for each default scenario. If the user deletes the selected scenario process, the selection is no longer valid and is marked NULL. As the default scenarios are versioned, at the time of creating a cycle period (not starting), this check must be made against the cycle definition and the creation of a new cycle period must be prevented. Incomplete Cycle [cycle] with a default scenario [scenario] and no scenario process defined.
SC043 Check the validity of the initialization macro selection for each default scenario. It the macro is deleted, the selection is no longer valid and is marked NULL. The status is set to Warning, because the scenario is successfully created without a workflow, but may differ from the expected result if a workflow is previously defined. Warning Cycle period [cycle]-[period] with a default scenario [scenario], and no initialization macro defined.
SC074 Check that the cycle is set up to start automatically (Process is Started > Manually), but the Next Period field is empty (NULL). In this case, the application cannot automatically create periods for this cycle because the period that must be started cannot be determined. The user must edit the cycle definition and set a valid Next Period value or set Process is Started to Manually.   Warning Cycle [cycle] with the automatic 'Process is Started' setting, however the Next Period is not determined. No new cycle periods are started by the system until the Next Period is populated with a period value. (Configuration \ Cycle). If automatic creation of new cycle periods is not required set 'Process is Started' = Manually.
SC075 Check the status of the calendar in Cycles. If the status is Invalid due to a failure during the creation of calendar buckets, or the calendar has Disabled status, an issue is raised. Incomplete Cycle is using calendar "{0})" with a status "Invalid" or "Disabled". Revise the calendar definition and correct the problem before starting the cycle period.
SC096 Check the cycle process linked to a cycle. If a cycle process setup is invalid, the start of the cycle period is prevented. Incomplete Cycle [cycle] using cycle process [cycle process] with an invalid setup. Revise the cycle process and rectify before the creation of a new cycle period for this cycle.
SC098 Check the planning hierarchies linked to a cycle. If a planning hierarchy setup is invalid or disabled, the start of the cycle period is prevented. Incomplete Cycle is using a planning hierarchy [planning hierarchy] with status Invalid or Disabled. Revise the planning hierarchy and correct the problem before starting the cycle period.
SC102 A module defined in Cycles does not contain measures. This prevents the creation of the measure dimension in the cube, causing problems. At least one measure must be defined for each module. Incomplete Cycle period [cycle]-[period] contains a module [module] that does not have measures defined. Disable this module in the Cycle, or define at least one measure for this module.
SC103 The additional planning hierarchy definitions must be complete. If a planning hierarchy that is in use by a cycle as an additional hierarchy is deleted, this leads to an incomplete definition. Incomplete Cycle period [cycle]-[period] with an incomplete additional planning hierarchy definition for module [module].
SC106 If the cycle process is set to start automatically, check that the previous cycle period can be calculated. Warning Cycle period [cycle]-[period] with an automatic 'Process is Started' setting. However, the previous cycle period cannot be calculated.
SC107 If an additional Pivot Attribute is defined in the cycle, all elements of the selected code list must be populated for that attribute. If a null value exists for any element in the corresponding code list, the cube is not populated correctly. Incomplete Cycle period [cycle]-[period] with an additional pivot attribute defined [code list].[attribute], which contains undefined values for elements within the code list. All code list elements must be populated for this to be a valid additional pivot attribute for this cycle.
SC108 Check the note type for a mandatory note during unlock and save changes. If a note type that is in use by a cycle is deleted, this leads to an incomplete definition. Incomplete Cycle period [cycle]-[period] with the Force Add Note on Unlock selected but no valid Default Note Type selected. Select a new note type or clear the Force Add Note on Unlock option
SC109 Check the note type for a mandatory note during worksheet recalculation. If a note type that is in use by a cycle is deleted, this leads to an incomplete definition. Incomplete Cycle period [cycle]-[period] with the Force Add Note on Recalculate selected but no valid Default Note Type selected. Select a new note type or clear the Force Add Note on Recalculate option
SC124 Check the measures that are used in a cycle. If the setup for the measure is invalid, the start of the cycle period is prevented. Incomplete Cycle period [cycle]-[period] is using a measure [measure] with an invalid setup. Revise the measure and correct the problem before starting the cycle period.
SC126 Check to ensure that the location hierarchy selection for each module is a planning hierarchy with defined levels, as the bottom level of each module's location hierarchy is used as the level to store scenario values. Incomplete Cycle period [cycle]-[period] is using a location hierarchy [hierarchy] with no levels defined. Revise the location hierarchy selection for module [module] and correct the problem before starting the cycle period
SC127 Verify that at least one module hierarchy is selected for a cycle. Incomplete Cycle "{0}" with no location hierarchies defined. Define a location hierarchy for at least one module.
SC128 Verify that the cycle has a valid combination of modules (location hierarchies selected). If a planning hierarchy is removed, the combination of modules can become invalid for a cycle. Incomplete Cycle has an invalid planning hierarchy selection of ("{0}", "{1}", "{2}", "{3}"). Revise the cycle and select location hierarchies for a valid combination of modules.
SC131 Check to ensure that any additional pivot attributes that are defined against the cycle do not contain values longer than 71 characters. Incomplete Cycle [cycle] with an additional pivot attribute defined [code list].[attribute], which contains elements greater than 71 characters. Modify each element to be not more than 71 characters for this attribute.
SC133

Check enabled calculation rules for the cycle to ensure that the referenced measures are also enabled for this cycle.

Warning  Cycle has a calculation rule [calc-rule] which references a measure [measure] that is not enabled for the cycle.
SC135 Create a set in the OLAP dimensions that corresponds to each level in the planning hierarchies used by a cycle, using Set and the level name (for example, Set_Level4Items). You must check if all the hierarchies for a dimension have a unique level name, wherein the code list differs. A same code list and level name can be used because you create the set for a unique code list. Level1 of a hierarchy is not checked as this contains a single element (no Set required). Incomplete Cycle has {0} hierarchies "{1}" with a non-unique level "{2}" that does not validate the {3} data cube. Edit the hierarchies to make all non-root levels unique.
SC137 When additional pivot attributes are defined for a cycle, check that the hierarchy used contains the same list of elements as the corresponding Cycle. Module hierarchy. Incomplete Cycle contains a {0} pivot attribute {1} for module {2} which is based on a hierarchy that contains elements which do not match the distinct pivot attributes.
SC139 Check if all the node/level names referenced by business metrics are valid when the cycle period is started/resumed. Incomplete Cycle contains a business metric "{0}" which refers to invalid "{1}" with names: "{2}"
SC140 Check additional hierarchies in comparison with the cycle hierarchies that do not have levels shared with the primary hierarchy, above the base level, and are not in sequence (consecutive) from the base level and higher. Incomplete Cycle includes hierarchies "{0}, {1}" with shared elements which are non-consecutive from the base level upwards. For shared elements, the child levels must also be shared in both hierarchies up to the base level. ({2})
SC141 Check additional hierarchies defined in comparison with the cycle hierarchies that have the same parent definitions for any shared levels. Different hierarchies can have different parent attributes and therefore, parent-child associations. Primary and Additional hierarchies in the Cycle with different parent-child relations for the shared levels are not allowed. The top shared level can have a different parent. Incomplete Cycle includes hierarchies "{0}, {1}" with shared elements on two or more levels; however some shared child levels are linked to different parent levels in the two hierarchies. ({2})
SC142 Check if any additional location hierarchies have a suitable primary location hierarchy defined for the specified module. There is no restriction on defining an additional hierarchy within any module. Warning Cycle with an additional hierarchy "{0}" of type location for module {1}, although the correspondent primary hierarchy is not defined. This additional hierarchy is not considered.
SC143 Check additional hierarchies to ensure that the root node is not the same as the primary hierarchy. Hierarchies can share levels from the base. However, the root node must be different. Incomplete Cycle has a hierarchy "{0}" which has a root element that is a duplicate of an element in another hierarchy "{1}". The root element must be unique. "{2}".
SC144 Check that each rolling period definition contains a calendar level that exists in the selected calendar. Incomplete Cycle has a Rolling Period [RP Top Level] which uses a calendar level that is not defined.
SC145 Check that each rolling period definition contains a calendar that is valid for the current cycle, based on the primary calendar or additional period hierarchies. Incomplete Cycle "{0}" with a Rolling Period "{1}" which uses a calendar that does not match either the primary calendar "{2}" or any calendars referenced in additional planning hierarchies "{3}".
SC146 Check that each rolling period definition is linked to a valid periodicity selection, based on the cycle periodicity and calendar level, to store scenario values. The selected periodicity must be between these ranges. Incomplete Cycle "{0}" with a Rolling Period "{1}" and a periodicity below "{2}".
SC147 Validate that all nodes between all period hierarchies defined for the cycle level are unique (except the shared bottom level). Incomplete Cycle with period hierarchies "{0}" which contain a non-unique node "{1}" that does not validate the {2} data cube.
SC149 Check business metrics for the cycle to ensure that the base measure is also enabled for this cycle. Warning Cycle has a business metric "{0}" which references a measure "{1}" that is not enabled for the cycle.
SC150 Check whether the current planning period can be defined. Incomplete Cycle Period "{0}" with no available planning periods.
SC152 An expert calculation rule can have a null target measure, using the filter field to specify the target. If a measure is removed, this cascade to a linked calculation rules, however, only invalidates the rule where no filter exists. Check for the existence of a measure or filter on all (expert) calculation rules. Warning  Calculation rule with module {0} and calculation sequence {1} with neither Filter nor Measure defined.
SC153 If background validation is in progress for a planning hierarchy that is in use by the cycle, this cannot be started or resumed (with refresh). Incomplete Planning hierarchy "{0}" with a status = "Building". The processes for the hierarchy must be executed prior to starting a new cycle period.
SC154 If background validation is in progress for a calendar that is in use by the cycle, this cannot be started or resumed (with refresh). Incomplete Calendar "{0}" with a status = "Building". The processes for the calendar must be executed prior to starting a new cycle period.
SC155 When part-weeks are enabled for a cycle, the calendar level to store scenario values must also be set to part-weeks. Incomplete Cycle is using a calendar with part-weeks enabled, but has the wrong calendar level {1} selected, it should be using {2}.
SC156 Check whether the interpolation calendar and an enabled period spread measure are defined as these are required to automatically create the period spread measure. If the base measure or interpolation calendar is deleted, then it will be removed from the cycle meaning the definition is not complete and cannot be started or resumed (with refresh). Incomplete Cycle must have an enabled Period Spread Measure and Interpolation Calendar defined. Both are required to create a default spread measure for periods
SC157 Check the pivot attributes selected for use within the Cycle are of type Text. Only code list elements that are of type text can be used as pivot attributes. Incomplete Cycle has a {0} pivot attribute "{1}" for module {2} which is not of type Text in the code list "{3}". Pivot Attributes must be type=Text
SC158 Check business metrics for the cycle to ensure that the base measure is also enabled for this cycle. Warning  Cycle has a business metric {0} which references a measure {1} that is not enabled for the cycle.
SC163 Check whether the macros defined within the initialization macro are correctly tagged for the Cycle. In this situation the macro is not executed upon start of a cycle period. Warning Cycle has default scenario " {0}" whose initialization macro is not enabled for the cycle with tags.
SC164 Check whether a Market Intelligence record for which the tag is set to enabled in a cycle, references any measures for which tags are not enabled for the same cycle. In this situation, the MI record is invalid and is not created at the start of a cycle period. Warning Cycle has an enabled Market Intelligence {0} which references measures {1,2,3 ...} that are not enabled for the cycle. Enable the relevant tags in the Cycle Configuration window.
SC165 Check whether multiple MI records using the same measure/module are set to enabled for the same cycle. In this situation, the MI records are invalid and are not created at the start of a cycle period. Warning Cycle has more than one enabled Market Intelligence record for module "{0}" using the same measure "{1}
SC166 Check whether multiple enabled MI records with the same Net Forecast Measure are set to Edit Net Forecast Directly. The Net Forecast Measure can only be edited directly in one MI record. In this situation, the MI records are invalid and are not created at the start of a cycle period. Warning  Cycle has more than one enabled Market Intelligence record for module "{0}" using the same Net Forecast Measure "{1} set to Edit Net Forecast Directly.
SC168 Check whether a calculation rule is based on a measure which is defined as a Market Intelligence record. In this situation, the calculation rule is invalid and is not created a the start of a cycle period. Warning  Cycle has an enabled Calculation rule {0} which is based on a measure {1} that is defined as a Market Intelligence record. Update the Calculation rule accordingly.
SC169 Check whether a calculation rule is based on a measure which is defined as a Transactional Data record and both are enabled for the same cycle. In this situation, the calculation rule is invalid and is not created at the start of a cycle period. Warning  Cycle has an enabled Calculation rule {0} which is based on a measure {1} that is defined as a Transactional Data record. Update the Calculation rule accordingly.
SC170 Check whether a measure is defined as a Transactional Data record and is enabled in a cycle, which also is defined as a Market Intelligence record and enabled for the same cycle. In this situation, the measure is invalid and the configuration cannot be completed. Incomplete Cycle has an enabled measure {0} which is defined as a Transactional Data record and a Market Intelligence record. Measure can only be used in one definition.
SC173 Check whether an enabled MI definition has the MI measure defined as a Net Forecast Measure in another enabled MI definition. Warning  Cycle has an enabled Market Intelligence Measure {0} whose Net Forecast Measure measure {1} is defined as a Market Intelligence Measure. Update the Market Intelligence measure accordingly.
SC176 If a Replenishment Engine is defined, check that the engine is enabled for the cycle. If the engine is not enabled, the engine is not available for selection for the cycle. Warning Cycle has a Replenishment Engine {0} which is not enabled for the cycle.
SC177 Check to ensure no duplicate components in the rolling period. Incomplete Cycle has a rolling period "{0}" which has a "{1}" element that is a duplicate of an element in another hierarchy "{2}". This element must be unique. "{3}"
SC179

If the cycle has an enabled Replenishment Engine, check the defined Supply Allocations for the engine settings (with measures), contain valid attributes in the base code list of the cycle’s item and location hierarchies for the specified module of the engine.

Checks against Item dimension = Item attribute, Routing (item)

Location dimension = Location attribute, Source Location, Customer, Supplier, Resource, Routing (location).

Incomplete Cycle has a Replenishment Engine {0} with Supply Allocation {1} which contains an Attribute {2} which cannot be found in the {3} dimension.
SC180 If the cycle has an enabled Replenishment Engine, check that the Order Data Measures defined in the engine settings are enabled for this cycle and exist for this cycle. Incomplete Cycle has a Replenishment Engine {0} which contains an Order Data Mapping {1} which is incomplete or not enabled for the cycle.
SC181 If the cycle has an enabled Replenishment Engine, check the measures defined in Item Location Measure Mapping, Purchase Measure Mapping, Transfer In Measure Mapping, and Transfer Out Measure Mapping for the engine settings are enabled (tagged) and available for this cycle and module. Incomplete Cycle has a Replenishment Engine {0} where the Measure Mapping {1} is incomplete or not enabled.
SC182 If the cycle has an enabled Replenishment Engine, check each calendar defined in Engine Calendar Mappings for the engine settings is complete. If the interpolation calendar is deleted, it is removed from the cycle meaning the definition is not complete and cannot be started or resumed (with refresh). Incomplete Cycle has a Replenishment Engine {0} with Calendar Mapping {1} that is incomplete.  
SC183 If the cycle has an enabled Replenishment Engine, check that the measures defined in Item Location Measure Mappings for output parameters, are not Market Intelligence measures. Incomplete Cycle has a Replenishment Engine {0} where the Measure Mapping {1} is a Market Intelligence measure. Measures of this type are not allowed for engine output.
SC184 If the cycle has an enabled Replenishment Engine, check that the measures defined in Item Location Measure Mappings for output parameters, are not Transactional Data measures. Incomplete Cycle has a Replenishment Engine "{0}" with Measure Mapping "{1}" that is a Transactional Data measure. Measures of this type are not allowed for engine output.
SC185 If the cycle has an enabled Replenishment Engine, check that at least one supply allocation mapping is defined. We can define an RP engine with one supply allocation type mapped, however, the measure referenced in that mapping is deleted. In this case we no longer have a supply allocation types mapped, and we always require at least one type mapped for the engine to be valid. Incomplete Cycle has a Replenishment Engine {0} for which some supply allocation measure mappings {1} are undefined.
SC187 Check whether a Transactional Data definition whose tag is set to enabled in a cycle references measures whose tags are not enabled for the same cycle. In this situation the Transactional data definition is invalid and is not created upon start of a cycle period. Warning  Cycle has an enabled Transactional Data {0} which references measure {0} which is not enabled for the cycle. Enable the relevant tags in the cycle configuration screen.
SC189 Check whether multiple Transactional Data definitions using the same measure or module are set to enabled for the same cycle. In this case, the Transactional Data records are invalid and not be created upon start of a cycle period. Warning  Cycle has more than one enabled Transaction Data for module "{0}" referencing the same measure "{1}
SC193 If Enable Telescopic is defined, ensure all calendar levels defined are available within the primary Calendar hierarchy. Incomplete Cycle is set to use Telescopic Calendar buckets for Calendar Levels that cannot be found.
SC194 If Enable Telescopic is defined, ensure all Horizon Levels used to determine granularity are available within the primary Calendar hierarchy. Incomplete Cycle is set to use Telescopic Calendar buckets which references Horizon Levels that cannot be found.
SC199 Check whether the macro defined as the initialization macro is enabled or accessible to users. Else, the macro is not executed upon start of the cycle period. Warning Cycle has default scenario "{0}" with an Initialization macro {1} which is not enabled or user does not have access.
SC201 Check that all transactional data measures used within a cycle, contain unique to (destination) and from (source) measures. Incomplete Cycle has a measure "{0}" that is used in more than one Transactional Data definition. A given measure can only be used in one Transactional Data, and as source or destination only.
SC202

Check attributes which are included in the hierarchy (that is, Include = True/ON) that the names of the attributes do not contain invalid characters.

Note: The planning hierarchy is not invalidated by invalid characters.
Warning 

Cycle has a planning hierarchy ""{0}"" with Included attribute ""{1}"" which contain invalid characters ""{2}""

This attribute is not available in the cycle.

""{0}"" = Planning Hierarchy display name

""{1}"" = Attribute name

""{2}"" = Invalid character

Code list

Code Check Status Message
SC095 Code List element name has a limit of 71 characters due to a restriction on each element name within OLAP. Warning  Code List [code list] contains element names greater than 71 characters. Modify each element name to be no more than 71 characters.

Calendar

Code Check Status Message
SC017 Check for the existence of a calendar. Incomplete No Calendars defined. 
SC018 Check that the calendar ending year is current, that is, this year or some time in the future. Warning Calendar [calendar] horizon is in the past.

Interface Service/Data Source

Code Check Status Message
SC020 Check for the existence of an interface service. Incomplete No Interface Services defined
SC022 Check the validity of the import/export measure selection(s). If the user deletes a measure that is defined in the interface service, the entry is incomplete. For example, the removal of a measure defined in an interface service prevents that measure from being imported/exported as part of the interface service. The status is Warning  because, although other defined measures may be valid, running the interface service in this state generates unexpected results. Incomplete Interface Service [service] has an incomplete measure entry. The associated measure label is [measurelabel].
SC070 Check the validity of the data source selection. If the data source is deleted, the value is NULL and the interface service definition becomes incomplete. Incomplete Interface Service [service] with no Data Source defined.
SC024 Check for the existence of a data source. Incomplete No Data Sources defined.

Measure/Calculation Rule

Code Check Status Message
SC027 Check for the existence of measures. Incomplete No Measures defined.
SC028 Check for a unit of measure selection. If the unit of measure or currency from MDM is deleted, the selection in Measure is no longer valid and is marked NULL. If no measures are defined for any modules, the status is set to Warning. Otherwise, the status is set to Incomplete. Incomplete/ Warning Measure [measure] with no Unit of Measure defined.
SC030 Check for the existence of calculation rules. Warning No Calculation Rules defined
SC031 Check the completeness of a simple calculation rule definition by the measures selected. If one of the measures used in a rule is deleted, the selection is longer valid and is marked NULL. If no measure is defined, the status is set to Warning. Otherwise, the status is set to Incomplete. Incomplete/ Warning Simple calculation rule [rule] refers to a measure which no longer exists.
SC072 Check the simple or expert calculation rule definition to ensure that the measure code on which the rule is based is valid. If the measure used in the rule is deleted, the measure selection is no longer valid and is marked NULL. The user must correct this before using the calculation rule Incomplete Calculation rule [rule] with no measure defined.
SC167 Check the completeness of a Market Intelligence definition. If one of the measures used in the definition is deleted then the MI definition is no longer valid. In this situation, the MI records are invalid and are not created at the start of a cycle period. Warning Market Intelligence {0} refers to a measure which no longer exists.

Note Type

Code Check Status Message
SC033 Check for the existence of an enabled note type. Warning No Note Types are enabled. 

Planning Hierarchy

Code Check Status Message
SC035 Check for the existence of a planning hierarchy. Incomplete No Planning Hierarchies defined. 
SC097 Check the Planning Hierarchies do not contain an element whose name is one of the following reserved words: ICONST, CONST, and PCONST. Warning  Code List "Code List Name" contains an element with name "ICONST" or "LCONST" or "PCONST". Modify the name of this element.
SC132 Check the status of a planning hierarchy. If Invalid, a Warning is displayed. Warning  Planning hierarchy [hierarchy] has a status Invalid.

Cycle process

Code Check Status Message
SC054 Check for the existence of a cycle process. Incomplete No Cycle Processes defined. 
SC055 Check each cycle process event for a task management workflow selection. If the workflow from WLM is deleted, the selection in Cycle Process is no longer valid and the selection is marked NULL. If no cycle process is defined for any cycles, the status is set to Warning. Otherwise, the status is set to Incomplete. Incomplete/ Warning Cycle Process event for [process] with no Task Management Workflow defined. 

Mapping

Code Check Status Message
SC057 Check that each of the hierarchies that are defined in the mapping is a valid planning hierarchy. Warning Mapping "{0}" is using hierarchy "{1}" with a status "Incomplete". Revise the hierarchy and correct the problem before the creation of new mapping.
SC058 Check for a source hierarchy level selection. If a previously selected location hierarchy is edited or deleted so that the selection is no longer valid, the location hierarchy is marked NULL in the associated mapping and flagged. Warning Mapping [mapping] with no Source Hierarchy level defined.
SC059 Check for a destination hierarchy level selection. If a previously selected location hierarchy is edited or deleted so that the selection is no longer valid, the location hierarchy is marked NULL in the associated mapping and flagged. Warning Mapping [mapping] with no Destination Hierarchy level defined.
SC094 Check each mapping for status = Invalid and display a warning here. Any mapping can be used in a macro, however, if the status = Invalid, the execution of the macro fails. Warning Mapping [mapping] with a status = Invalid. The mapping must be corrected prior to usage.
SC122 Any code list used as part of a mapping definition requires additional validation upon changes to the mapping configuration or changes to the code list attributes or elements. The share factor defined for each mapping pair must be a positive number > 0. Warning Mapping [mapping] contains a share attribute value [share] that is invalid. Edit the associated code list [code list] to ensure the share of each element is a positive number greater than 0.
SC123 Any code list used as part of a mapping definition requires additional validation upon changes to the mapping configuration or changes to the code list attributes or elements. Each source and destination combination must appear only once. Warning Mapping [mapping] contains a duplicate mapping pair [source]-[destination], which may lead to unexpected results. Review the associated code list [code list] to remove duplicates and ensure that the correct mapping pair is used.

Replenishment Engine

Code Check Status Message
SC200 Check the replenishment engine has all required attributes populated when the supply allocation measure is also populated. Incomplete Cycle has a Replenishment Engine {0} with Supply Allocation {1} which does not have required attribute {2}