Check schedule
The
functionality can be used to validate the schedule within the work area for the selected constraint violations in selected batches, orders, inventory points and utilities. These validations are performed:- Process steps are checked for method conflicts.
- Quantities are checked.
- Process step description are checked.
- Tank groups are checked for compatibility with the process steps to which the tank group have been related.
- Entities such as departments and products are checked to ensure that all entities have a unique code.
Note: A report is displayed in the Messages window after the verification
is completed.