Horizon
The horizon indicates the period that is displayed in the horizon view for which batches are created in the planning board. Batches outside the horizon are not displayed, though the batches are included in calculations. This image displays the relationship between horizon and the work area.
This table shows the activities on Horizon and the impact on Horizon Start:
Activity | Effects on Horizon Start |
---|---|
Changing the Horizon Start: | X |
Changing the Horizon End: | X |
Changing the Horizon Length: | |
Changing the Work Area Start: | |
Changing the Work Area End: | |
Changing the Work Area Length: |