General tab
- Specify the description for the resource on the General tab in the entry window.
- Select a timetable from the timetable list.
- Define the minimum and maximum volume or weight.
-
Specify the maximum batch duration.
Note: The maximum batch duration is considered for the tank and process batches. You can also define the duration for the maximum tank batch at the process step level. If both values are specified, the smaller value out of the two values is used.
Related topics