Objectives tab

  1. Click the Objectives tab.
  2. Specify the relative weights for the different solver objectives in the Objective weights section. For example, changeover and setup on time period.
  3. Specify this information in the CIP objective section, if the CIP solver is enabled on the CIP tab:
    1. Specify the number of CIP batches on the scheduled resources in the CIP usage field.
      Note: In case of multiple objectives, you must specify a high number, at least 10.000. It is recommend to use a percentage of 1% for the improvement to the next better solution.
    2. Select duration for the summed CIP duration instead of the number of batches to be minimized by the objective.
  4. Click the OK to save the changes and close the window. Alternatively, continue populating tabs on this window.