Utility requirements

The utility requirements simulation is a graphical representation of the utilities for production. The production is based on the scheduled batches, the utility requirements, shift times, and the number of workers required to operate the resources defined in the time period. If you cannot view this graph in the planning board, the graph is not included in the view definition.

You can click to open a list of all departments with the process groups.

You can click on the left to open an information bar providing details of the utilities required per each shift.

Note: A red line indicates the utility is a critical utility and a dotted red line indicates a non-critical utility.