Due date or time
The due date or time of an order is the desired end date for production for that order. The due date or time can be specified manually when creating orders or specified automatically with an interface. The aim of scheduling is to ensure that it is preceded by the scheduled time of the order - the time at which the last end product batch is ready. The end of that part of the outflow from the last batch that flows to that order. The latest end of an end product batch is the minimum play until the due time of the orders for which this batch is producing. The fact that the batch delivers products for the entire inflow segment is considered. In this case, the first part of the batch flows out to the order with the earliest due time.