Checking a schedule for all or some aspects

  1. Select Schedule > Check Schedule. The Check Schedule window is displayed.
  2. Clear the check selection only check box.
  3. Select one or more schedule to be checked. Possible values:
    • Check process batches
    • Check tank batches
    • Check enabling batches
    • Check orders
    • Check inventory points
    • Check utilities
    Note: The time required to perform the check and the number of error messages are based on the number of schedule selected.
  4. Double-click the individual errors for review the details.