Checking a schedule for all or some aspects
- Select Schedule > Check Schedule. The Check Schedule window is displayed.
- Clear the check selection only check box.
-
Select one or more schedule to be checked. Possible values:
- Check process batches
- Check tank batches
- Check enabling batches
- Check orders
- Check inventory points
- Check utilities
Note: The time required to perform the check and the number of error messages are based on the number of schedule selected. - Double-click the individual errors for review the details.
Related topics