Resource claim tab
- Click Select to select an enabling resource group and corresponding resources. The first column is a tree view that displays the claimed enabling resource groups in level one. The children at the level below, represents the resources associated with the current resource group.
-
Select the batch segments such as default, setup, inflow, offset, slack, outflow
and changeover, in the remaining columns, during which the enabling resource group
must be claimed. The claims behind the enabling resource groups (tree level 1)
represent the default claim for the resources in the current resource group. The
claims behind the resources (tree level 2) represent the actual claim for the
enabling resource group for that specific resource.
Note:
- You can double-click in a segment cell to claim the segment (a check mark appears in the segment). You can double-click to clear the segment.
- If a claim for an enabling resource group (tree level 1) is modified, the claim for this segment overwrites the existing segment claim of all lower level. resources. Modifications of a claim at the resource level (tree level 2) only affects the segment claim for that particular resource.
Note: If an enabling resource group is not selected, the claim for the enabling resource group is canceled. This means that the resource participation in the currently selected resource group no longer claims a resource from that enabling resource group during any of the batch segments.