General tab
- Specify a description in the appropriate field.
-
Select the
check schedule check box
if this is a critical resource group that must be verified when you process the
Check schedule function.
Note: A non-critical resource is a resource that is adequate and is not a reason for a delay in production.
-
Change the efficiency of a resource in a resource group, if
necessary.
The efficiency field is a coefficient to set efficiency for all resources in the resource group. The efficiency value 1.0 represents 100% efficiency.
- Select the is critical check box if you require this group to be included when running the solver.
-
The
distribution strategy
field is used to select the strategy when allocating tank batches.
The list is only enabled if the tank is selected in the category field.
- Click Select in the Resource Selection window to include resource in the group.
-
Change the group type, if necessary.
Note: The group type field can only be modified if the category is process and at least two resources are selected. Else, the group type is a choice group.