Configuring ION

These actions must be performed in ION to publish the plan results to Data Lake successfully:

  1. Perform these actions after SCP is provisioned in MT cloud:
    1. Verify that the ibp_ims connection point for SCP is pre-configured.
    2. Verify that the IBP-Datalake-Flow data flow is pre-configured.
  2. Perform these actions after each new metadata published to ION Data Catalog by executing the published metadata macros:
    1. Update connection to ibp_ims to add the new published documents.
    2. Activate the ibp_ims connection point, if inactive.
    3. Update IBP-Datalake-Flow data flow to add the new published documents.
    4. Reactivate (deactivate and activate again) the IBP-Datalake-Flow data flow.