Planning Engine report

You can configure plansheet based on a Planning Engine report. This report is a tabular report of planning Engine data on rows and columns The data is displayed based on the parameters or the contextual data. The report also contains a graph (optional) below the pivot area.

To configure a plansheet of type Planning Engine:

  1. Select Configuration > Planning Engines > Plansheets.
  2. Click New and select Standard Plansheet.
  3. Specify this information on the Details tab:
    Report
    The type of Plansheet report. Set to Planning Engine in this case.

    See Configuring standard plansheets for all other fields.

  4. Click on the Parameters tab to define data parameters for the Planning Engine plansheet.
  5. Click Save.