Period parameters
This table lists the period parameters applicable for the Planning Engine report:
Field | Name | Default | Description |
---|---|---|---|
rv_period_passed | Periods Passed | None |
The list of periods that must be displayed in the plansheet. If not populated, all periods for the selected resource and properties are displayed. Period selection with optional aggregation, for example when prefixed with * and optional range size. The period selection is given by name or by index and displayed as follows: (*)[<period name> or #<period index>] + <range size> See, Period Syntax. |
rv_period_except | Periods Hidden on Pivot | None | The list of periods that are hidden on the plansheet upon loading. A subset of rv_period_passed. [<period name> or #<period index>] + <range size>. If not defined then all elements in rv_period_passed are visible. |
rv_period_lock | Periods Edit Lock | None |
The list of periods that are locked from editing. A subset of rv_period_passed. (*)[<period name> or #<period index>] + <range size> If not defined then all elements in rv_period_passed are editable. |