Drag and Drop in SCP Production Scheduling views
Drag and drop of Process Batches, on the time axis, is now available within the SCP
Production Scheduling Views, extending the usability of the web-browser scheduling view within
SCP.
Any changes made within SCP Views are recorded within the change log.
Note: This feature is available on upgrade. Access to drag and drop capabilities are only
available for users with these permissions:
- Production Scheduling - Modeler
- Production Scheduling - Power User.
These permissions are already assigned to these default roles:
- Production Scheduling Main System Administrator role (IBP_AS_SystemsAdmin)
- Production Scheduling Modeler role (IBP_AS_Modeler).
Alternatively, these permissions can be added manually to the appropriate roles through Configuration > Security > Roles.