Creating Planning Engine
- Select Process > Planning Engine. The list of planning engines is displayed.
- Click the ellipses and select New.
- Specify this information:
- Name
- A unique name of the planning engine.Note: If a Cycle is defined for the planning engine, the name is not required. If not defined, the name is populated based on Cycle.Start Period.
- Display Name
- The name that is displayed for the planning engine.
- Category
- The category to which the planning engine to be linked. You
can create a new category or select from the categories already defined.Note:
- The category name is displayed in the Main menu.
- If Category is not defined, Display Name is used as category name.
- Planning Engine Definition
- The definition used to create an instance of the Planning Engine.
- Roles
- The roles authorized to access planning engine.Note: This value is defaulted based on the value specified for Planning Engine Definition.
- Tags
- The tags that have access to the planning engine.Note: This value is defaulted based on the value specified for Planning Engine Definition.
- Cycle
- The cycle associated with the planning engine.Note: If this value is specified, you must specify the values for Calendar, Start Period and Horizon.
- Calendar
- The SCP calendar used when creating the calendar for the
planning engine.Note: If this value is specified, you must specify the values for Start Period and Horizon.
- Start Period
- The period from the specified SCP calendar based on the Level selected.Note:
- This value is used for the starting period of the planning engine calendar.
- If this value is specified, you must specify the values for Calendar and Horizon.
- Horizon
- The number of periods to be created in the planning engine calendar.Note: If this value is specified, you must specify the values for Calendar and Start Period.
- Level
- The calendar level to be used when creating the planning
engine calendar.Note: If this value is not specified, the base level of the calendar is considered.
- Status
- The current status of the Planning Engine. Possible
values:
- Master
- Running
- Published
- Complete
-
Click Save. The Planning Engine is
created with status Master after successful
validation.
Note:
- The planning engine contain the specified information and associated with the worksheets.
- If planning engines already exist with Running or Master status in
the specified cycle, this error message is
displayed:
There is already a Running or Master Planning Engine using cycle [cycle], the cycle is unique when creating a new planning engine.
- If the specified Calendar does not have the required periods from
the start period to cover the horizon, this error message is
displayed:
The Calendar does not contain enough buckets from the Start Period to extend to the Horizon.
You can use the Planning Engines page to:
- Create a duplicate of the existing Planning Engine (with status Running or Master) and modify the parameters as required using the Copy option.
- Delete Planning Engines using the Delete option. The notes associated with the planning engine are also deleted when you delete a planning engine.