| SC001  | 
						Check the validity of each of the
							module hierarchy selections. Modules that are not selected are flagged.
							Or, if a previously selected location hierarchy is deleted, the
							selection is no longer valid and the value is NULL in the Cycles page and is flagged.  | 
						Warning  | 
						Cycle period [cycle]-[period] with the
							[module] module and the required fields, which are not completed. The
							[module] module is unavailable.   | 
					
					
						| SC004  | 
						
							 Check for a calendar selection in the cycle period.
								If the user deletes the calendar that is defined in the cycle, the
								selection is no longer NULL and is flagged .  
						 | 
						Incomplete  | 
						Cycle [cycle] with no Calendar
							defined.  | 
					
					
						| SC005  | 
						Check for a calendar level to store
							the scenario values in the cycle period. If the user updates the
							selected calendar, the level selection can be invalid. For example, the
							removal of the quarters from the selected calendar can generate an
							error, if the quarters are the default calendar level. The selection is
							no longer valid and the value is NULL.  | 
						Incomplete  | 
						Cycle [cycle] with no Calendar level
							defined.  | 
					
					
						| SC007  | 
						Check for an item hierarchy in the
							cycle period. If the user deletes the selected item hierarchy, the
							selection in Cycles is no longer
							valid and the selection is marked NULL.  | 
						Incomplete  | 
						Cycle period [cycle]-[period] with no
							Item Hierarchy defined.  | 
					
					
						| SC008  | 
						Check for an item hierarchy level to
							store scenario values in the cycle period. If the user updates the
							selected item hierarchy, the selection can be invalid. For example, the
							removal of a level from the selected hierarchy can generate an error.
							The selection is no longer valid and is marked NULL .  | 
						Incomplete  | 
						Cycle period [cycle]-[period] with no
							Item Hierarchy level defined.  | 
					
					
						| SC009  | 
						Check for a base currency  in the
							cycle period. If the currency from MDM is deleted, the selection in
								Cycles is no longer valid and
							the selection is marked NULL.  | 
						Incomplete  | 
						Cycle period [cycle]-[period] with no
							Base Currency defined.  | 
					
					
						| SC040  | 
						Check for a periodicity selection. If
							the user updates the selected calendar, the level selection can be
							invalid. For example, the removal of the quarters from the selected
							calendar can generate an error, if quarters are the periodicity setting
							for this cycle. The selection is no longer valid and is marked NULL,
							which leads to this error.  | 
						Incomplete  | 
						Cycle [cycle] with no periodicity
							defined.  | 
					
					
						| SC041  | 
						Check for a cycle process selection.
							If the user deletes the selected cycle process, the selection is no
							longer valid and is marked NULL. The cycle can be created successfully
							without a process definition, but data is blank and can differ from the
							expected result, if a process is previously defined.  | 
						Warning  | 
						Cycle period [cycle]-[period] with no
							cycle process defined.  | 
					
					
						| SC042  | 
						Check the validity of the scenario
							process selection, for each default scenario. If the user deletes the
							selected scenario process, the selection is no longer valid and is
							marked NULL. As the default scenarios are versioned, at the time of
							creating a cycle period (not starting), this check must be made against
							the cycle definition and the creation of a new cycle period must be
							prevented.  | 
						Incomplete  | 
						Cycle [cycle] with a default scenario
							[scenario] and no scenario process defined.  | 
					
					
						| SC043  | 
						Check the validity of the
							initialization macro selection for each default scenario. It the macro
							is deleted, the selection is no longer valid and is marked NULL. The
							status is set to Warning, because the scenario is successfully created
							without a workflow, but may differ from the expected result if a
							workflow is previously defined.  | 
						Warning  | 
						Cycle period [cycle]-[period] with a
							default scenario [scenario], and no initialization macro defined.
						 | 
					
					
						| SC045  | 
						Check for an update of the cycle
							definition for the version linked to the current cycle period.  | 
						Updated  | 
						Cycle differs from the version used in
							Cycle Period [cycle] - [period]. Updates are effective from the start of
							the next Cycle Period.  | 
					
					
						| SC047  | 
						 | 
						Updated  | 
						Calendar [calendar] differs from the
							version used in Cycle Period [cycle] - [period]. Updates are effective
							from the start of the next Cycle Period. Check for an update of the calendar
							for the version linked to the current cycle period, where applicable.  | 
					
					
						| SC048  | 
						Check for an update of the measure for
							the version linked to the current cycle period.  | 
						Updated  | 
						Measure [measure] differs from the
							version used in Cycle Period [cycle] - [period]. Updates are effective
							from the start of the next Cycle Period.  | 
					
					
						| SC049  | 
						Check for an update of the calculation
							rule for the version linked to the current cycle period.  | 
						Updated  | 
						Check for an update of the calendarCalendar Rule [rule] differs from the
							version used in Cycle Period [cycle] - [period]. Updates are effective
							from the start of the next Cycle Period.  | 
					
					
						| SC050  | 
						Check for an update of the note type
							for the version linked to the current cycle period.  | 
						Updated  | 
						Note Type [type] differs from the
							version used in Cycle Period [cycle] - [period]. Updates are effective
							from the start of the next Cycle Period.  | 
					
					
						| SC051  | 
						Check for an update of the planning
							hierarchy for the version linked to the current cycle period, where
							applicable.  | 
						Updated  | 
						Planning Hierarchy [hierarchy]
							differs from the version used in Cycle Period [cycle] - [period].
							Updates are effective from the start of the next Cycle Period.  | 
					
					
						| SC052  | 
						Check for an update of the cycle
							process for the version linked to the current cycle period, where
							applicable.  | 
						Updated  | 
						Cycle Process [process] differs from
							the version used in Cycle Period [cycle] - [period]. Updates are
							effective from the start of the next Cycle Period.  | 
					
					
						| SC053  | 
						Check for an update of the workflow
							for the version linked to the current cycle period, where applicable.  | 
						Updated  | 
						Workflow [workflow] differs from the
							version used in Cycle Period [cycle] - [period]. Updates are effective
							from the start of the next Cycle Period.  | 
					
					
						| SC074  | 
						Check that the cycle is set up to
							start automatically (Process is Started > Manually), but the Next Period field is empty (NULL).
							In this case, the application cannot automatically create periods for
							this cycle because the period that must be started cannot be determined.
							The user must edit the cycle definition and set a valid Next Period value
							or set Process is
								Started to Manually.    | 
						Warning  | 
						Cycle [cycle] with the automatic
							'Process is Started' setting, however the Next Period is not determined.
							No new cycle periods are started by the system until the Next Period is
							populated with a period value. (Configuration \ Cycle). If automatic
							creation of new cycle periods is not required set 'Process is Started' =
							Manually.  | 
					
					
						| SC075  | 
						Check the status of the calendar in
								Cycles. If the status is
							Invalid due to a failure during the creation of calendar buckets, an
							issue is raised.  | 
						Incomplete  | 
						Cycle period [cycle]-[period] is
							using calendar [calendar] with a status = "Invalid". Revise the calendar
							definition and correct the problem before starting the cycle period.
						 | 
					
					
						| SC077  | 
						Check for new calendar definitions
							against the version used in the current cycle period. The message is
							only generated for cycles with the status = Running (not Aborted,
							Completed, Pending).  | 
						Updated  | 
						Calendar [calendar] is added during
							the current cycle period. These changes are effective from the next
							Cycle Period.  | 
					
					
						| SC078  | 
						Check for new measure definitions
							against the version used in the current cycle period. The message is
							only generated for cycles with the status = Running (not Aborted,
							Completed, Pending).  | 
						Updated  | 
						Measure [measure] is added during the
							current cycle period. These changes are effective from the next Cycle
							Period.  | 
					
					
						| SC079  | 
						Check for new calculation rules
							against the version used in the current cycle period. The message is
							only generated for cycles with the status = Running (not Aborted,
							Completed, Pending).  | 
						Updated  | 
						Calculation Rule [rule] is added
							during the current cycle period. These changes are effective from the
							next Cycle Period.  | 
					
					
						| SC080  | 
						Check for new planning hierarchy
							definitions against the version used in the current cycle period. The
							message is only generated for cycles with the status = Running (not
							Aborted, Completed, Pending).  | 
						Updated  | 
						Planning Hierarchy [hierarchy] is
							added during the current cycle period. These changes are effective from
							the next Cycle Period.  | 
					
					
						| SC081  | 
						Check for new cycle process
							definitions against the version used in the current cycle period. The
							message is only generated for cycles with the status = Running (not
							Aborted, Completed, Pending).  | 
						Updated  | 
						Cycle Process [process] is added
							during the current cycle period. These changes are effective from the
							next Cycle Period.  | 
					
					
						| SC082  | 
						Check for new scenario process
							definitions against the version used in the current cycle period. The
							message is only generated for cycles with the status = Running (not
							Aborted, Completed, Pending).  | 
						Updated  | 
						Scenario Process [process] is added
							during the current cycle period. These changes are effective from the
							next Cycle Period  | 
					
					
						| SC083  | 
						Check for deleted cycle definitions
							against the version used in the current cycle period. This only applies
							to the deleted cycle.  | 
						Updated  | 
						Cycle Definition [cycle] is deleted
							during the current cycle period. These changes are effective from the
							next Cycle Period.  | 
					
					
						| SC084  | 
						Check for deleted calendar
							definitions against the version used in the current cycle period. The
							message is only generated for cycles with the status = Running (not
							Aborted, Completed, Pending).  | 
						Updated  | 
						Calendar [calendar] is deleted during
							the current cycle period. These changes are effective from the next
							Cycle Period.  | 
					
					
						| SC085  | 
						Check for deleted measure definitions
							against the version used in the current cycle period. The message is
							only generated for cycles with the status = Running (not Aborted,
							Completed, Pending).  | 
						Updated  | 
						Measure [measure] is deleted during
							the current cycle period. These changes are effective from the next
							Cycle Period.  | 
					
					
						| SC086  | 
						Check for deleted calculation rules
							against the version used in the current cycle period. The message is
							only generated for cycles with the status = Running (not Aborted,
							Completed, Pending).  | 
						Updated  | 
						Calculation Rule [rule] is deleted
							during the current cycle period. These changes are effective from the
							next Cycle Period.  | 
					
					
						| SC087  | 
						Check for deleted planning hierarchy
							definitions against the version used in the current cycle period. The
							message is only generated for cycles with the status = Running (not
							Aborted, Completed, Pending).  | 
						Updated  | 
						Planning Hierarchy [hierarchy] is
							deleted during the current cycle period. These changes are effective
							from the next Cycle Period.  | 
					
					
						| SC088  | 
						Check for deleted cycle process
							definitions against the version used in the current cycle period.
							Message is only generated for cycles with the status = Running (not
							Aborted, Completed, Pending).  | 
						Updated  | 
						Cycle Process [process] is deleted
							during the current cycle period. These changes are effective from the
							next Cycle Period.  | 
					
					
						| SC089  | 
						Check for deleted scenario process
							definitions against the version used in the current cycle period. The
							message is only generated for cycles with the status = Running (not
							Aborted, Completed, Pending).  | 
						Updated  | 
						Scenario Process [process] is deleted
							during the current cycle period. These changes are effective from the
							next Cycle Period.  | 
					
					
						| SC096  | 
						Check the cycle process linked to a
							cycle. If a cycle process setup is invalid, the start of the cycle
							period is prevented.  | 
						Incomplete  | 
						Cycle [cycle] using cycle process
							[cycle process] with an invalid setup. Revise the cycle process and
							rectify before the creation of a new cycle period for this cycle.
						 | 
					
					
						| SC098  | 
						Check the planning hierarchies linked
							to a cycle. If a planning hierarchy setup is invalid, the start of the
							cycle period is prevented.  | 
						Incomplete  | 
						 Cycle using hierarchy "{0}" with a
							status = "Invalid". Revise the hierarchy and rectify before starting the
							cycle period.  | 
					
					
						| SC101  | 
						Check the code lists used for
							planning hierarchies in a cycle period. If a code list setup is invalid,
							the start of the cycle period is prevented.  | 
						Incomplete  | 
						Cycle period [cycle]-[period] is
							using a planning hierarchy [hierarchy] based on Code List [code list]
							setup is invalid. Revise the Code List and rectify before starting the
							cycle period.  | 
					
					
						| SC102  | 
						A module defined in Cycles does not contain measures. This
							prevents the creation of the measure dimension in the cube, causing
							problems. At least one measure must be defined for each module.  | 
						Incomplete  | 
						Cycle period [cycle]-[period]
							contains a module [module] that does not have measures defined. Disable
							this module in the Cycle, or define at least one measure for this
							module.  | 
					
					
						| SC103  | 
						 The additional planning hierarchy
							definitions must be complete. If a planning hierarchy that is in use by
							a cycle as an additional hierarchy is deleted, this leads to an
							incomplete definition.  | 
						Incomplete  | 
						Cycle period [cycle]-[period] with an
							incomplete additional planning hierarchy definition for module [module].
						 | 
					
					
						| SC104  | 
						The additional pivot attribute
							definitions must be complete. If a code list or code list attribute is
							deleted that is in use by a cycle as an additional pivot attribute, this
							leads to an incomplete definition.  | 
						Incomplete  | 
						Cycle period [cycle]-[period] with an
							incomplete additional pivot attribute for [Description].  | 
					
					
						| SC105  | 
						 The previous cycle period must be
							valid prior to starting a cycle period, based on all valid completed
							cycle periods.  | 
						Incomplete  | 
						Cycle period [cycle]-[period] with an
							invalid cycle period selected previously.  | 
					
					
						| SC106  | 
						If the cycle process is set to start
							automatically, check that the previous cycle period can be calculated.  | 
						 Warning  | 
						Cycle period [cycle]-[period] with an
							automatic 'Process is Started' setting. However, the previous cycle
							period cannot be calculated.  | 
					
					
						| SC107  | 
						If an additional Pivot Attribute is
							defined in the cycle, all elements of the selected code list must be
							populated for that attribute. If a null value exists for any element in
							the corresponding code list, the cube is not populated correctly.  | 
						Incomplete  | 
						Cycle period [cycle]-[period] with an
							additional pivot attribute defined [code list].[attribute], which
							contains undefined values for elements within the code list. All code
							list elements must be populated for this to be a valid additional pivot
							attribute for this cycle.  | 
					
					
						| SC108  | 
						Check the note type for a mandatory
							note during unlock and save changes. If a note type that is in use by a
							cycle is deleted, this leads to an incomplete definition.  | 
						Incomplete  | 
						Cycle period [cycle]-[period] with
							the Force Add Note on Unlock selected but no valid Default Note Type
							selected. Select a new note type or clear the Force Add Note on Unlock
							option  | 
					
					
						| SC109  | 
						Check the note type for a mandatory
							note during worksheet recalculation. If a note type that is in use by a
							cycle is deleted, this leads to an incomplete definition.  | 
						Incomplete  | 
						Cycle period [cycle]-[period] with
							the Force Add Note on Recalculate selected but no valid Default Note
							Type selected. Select a new note type or clear the Force Add Note on Recalculate
							option  | 
					
					
						| SC124  | 
						Check the measures that are used in a
							cycle. If the setup for the measure is invalid, the start of the cycle
							period is prevented.  | 
						Incomplete  | 
						Cycle period [cycle]-[period] is
							using a measure [measure] with an invalid setup. Revise the measure and
							correct the problem before starting the cycle period.  | 
					
					
						| SC125  | 
						 Check the calculation rules that are
							used in a cycle. If the calculation rule setup is invalid, the start of
							the cycle period is prevented.  | 
						Incomplete  | 
						Cycle period [cycle]-[period] is
							using a calculation rule [rule] with an invalid setup. Revise the
							calculation rule and correct the problem before starting the cycle
							period.  | 
					
					
						| SC126  | 
						Check to ensure that the location
							hierarchy selection for each module is a planning hierarchy with defined
							levels, as the bottom level of each module's location hierarchy is used
							as the level to store scenario values.  | 
						Incomplete  | 
						Cycle period [cycle]-[period] is
							using a location hierarchy [hierarchy] with no levels defined. Revise
							the location hierarchy selection for module [module] and correct the
							problem before starting the cycle period  | 
					
					
						| SC127  | 
						Verify that at least one module
							hierarchy is selected for a cycle.  | 
						Incomplete  | 
						Cycle "{0}" with no location
							hierarchies defined. Define a location hierarchy for at least one
							module.  | 
					
					
						| SC128  | 
						Verify that the cycle has a valid
							combination of modules (location hierarchies selected). If a planning
							hierarchy is removed, the combination of modules can become invalid for
							a cycle.  | 
						Incomplete  | 
						 Cycle has an invalid planning
							hierarchy selection of ("{0}", "{1}", "{2}", "{3}"). Revise the cycle
							and select location hierarchies for a valid combination of modules.
						 | 
					
					
						| SC131  | 
						Check to ensure that any additional
							pivot attributes that are defined against the cycle do not contain
							values longer than 71 characters.  | 
						Incomplete  | 
						Cycle [cycle] with an additional
							pivot attribute defined [code list].[attribute], which contains elements
							greater than 71 characters. Modify each element to be not more than 71
							characters for this attribute.  | 
					
					
						| SC135  | 
						Create a set in the OLAP dimensions
							that corresponds to each level in the planning hierarchies used by a
							cycle, using Set and the level name (for example, Set_Level4Items). You
							must check if all the hierarchies for a dimension have a unique level
							name, wherein the code list differs. A same code list and level name can
							be used because you create the set for a unique code list. Level1 of a
							hierarchy is not checked as this contains a single element (no Set
							required).  | 
						Incomplete  | 
						 Cycle has {0} hierarchies "{1}" with
							a non-unique level "{2}" that does not validate the {3} data cube. Edit
							the hierarchies to make all non-root levels unique.  | 
					
					
						| SC139  | 
						Check if all the node/level names
							referenced by business metrics are valid when the cycle period is
							started/resumed.  | 
						Incomplete  | 
						Cycle contains a business metric
							"{0}" which refers to invalid "{1}" with names: "{2}"  | 
					
					
						| SC140  | 
						Check additional hierarchies in
							comparison with the cycle hierarchies that do not have levels shared
							with the primary hierarchy, above the base level, and are not in
							sequence (consecutive) from the base level and higher.  | 
						Incomplete  | 
						 Cycle includes hierarchies "{0},
							{1}" with shared elements which are non-consecutive from the base level
							upwards. For shared elements, the child levels must also be shared in
							both hierarchies up to the base level. ({2})  | 
					
					
						| SC141  | 
						Check additional hierarchies defined
							in comparison with the cycle hierarchies that have the same parent
							definitions for any shared levels. Different hierarchies can have
							different parent attributes and therefore, parent-child associations.
							Primary and Additional hierarchies in the Cycle with different
							parent-child relations for the shared levels are not allowed. The top
							shared level can have a different parent.  | 
						Incomplete  | 
						 Cycle includes hierarchies "{0},
							{1}" with shared elements on two or more levels; however some shared
							child levels are linked to different parent levels in the two
							hierarchies. ({2})  | 
					
					
						| SC142  | 
						Check if any additional location
							hierarchies have a suitable primary location hierarchy defined for the
							specified module. There is no restriction on defining an additional
							hierarchy within any module.  | 
						Warning  | 
						 Cycle with an additional hierarchy
							"{0}" of type location for module {1}, although the correspondent
							primary hierarchy is not defined. This additional hierarchy is ignored.
						 | 
					
					
						| SC143  | 
						Check additional hierarchies to
							ensure that the root node is not the same as the primary hierarchy.
							Hierarchies can share levels from the base. However, the root node must
							be different.  | 
						Incomplete  | 
						 Cycle includes hierarchies "{0},
							{1}" with shared elements which are non-consecutive from the base level
							upwards. For shared elements, the child levels must also be shared in
							both hierarchies up to the base level. ({2}) | 
					
					
						| SC145  | 
						Check that each rolling period
							definition contains a calendar that is valid for the current cycle,
							based on the primary calendar or additional period hierarchies.  | 
						Incomplete  | 
						 Cycle "{0}" with a Rolling Period
							"{1}" which uses a calendar that does not match either the primary
							calendar "{2}" or any calendars referenced in additional planning
							hierarchies "{3}".  | 
					
					
						| SC146  | 
						Check that each rolling period
							definition is linked to a valid periodicity selection, based on the
							cycle periodicity and calendar level, to store scenario values. The
							selected periodicity must be between these ranges.  | 
						Incomplete  | 
						 Cycle "{0}" with a Rolling Period
							"{1}" and a periodicity below "{2}".  | 
					
					
						| SC147  | 
						Validate that all nodes between all
							period hierarchies defined for the cycle level are unique (except the
							shared bottom level).  | 
						Incomplete  | 
						 Cycle with period hierarchies "{0}"
							which contain a non-unique node "{1}" that does not validate the {2}
							data cube.  | 
					
					
						| SC149  | 
						Check business metrics for the cycle
							to ensure that the base measure is also enabled for this cycle.  | 
						Warning  | 
						 Cycle has a business metric "{0}"
							which references a measure "{1}" that is not enabled for the cycle.
						 | 
					
					
						| SC150  | 
						Check whether the current planning
							period can be defined.  | 
						Incomplete  | 
						 Cycle Period "{0}" with no available
							planning periods.  | 
					
					
						| SC151  | 
						Check whether each forecast engine is
							linked to a default parameter code list. This is required for each
							forecast engine defined, however, if the user deletes the code list
							defined in the forecast engine, the selection is no longer valid and is
							marked NULL and flagged.  | 
						Warning  | 
						 Forecast engine {0} with no default
							parameter code list defined.  | 
					
					
						| SC152  | 
						  | 
						  | 
						 Calculation rule with module {0} and
							calculation sequence {1} with neither Filter nor Measure defined.
						 | 
					
					
						| SC153  | 
						  | 
						  | 
						 Planning hierarchy "{0}" with a
							status = "Building". The processes for the hierarchy must be executed
							prior to starting a new cycle period.  | 
					
					
						| SC154  | 
						  | 
						  | 
						 Calendar "{0}" with a status =
							"Building". The processes for the calendar must be executed prior to
							starting a new cycle period.  | 
					
					
						| SC164 | 
						Check whether a Market Intelligence
							record for which the tag is set to enabled in a cycle, references any
							measures for which tags are not enabled for the same cycle. In this
							situation, the MI record is invalid and is not created at the start of a
							cycle period. | 
						Warning | 
						Cycle has an enabled Market
							Intelligence {0} which references measures {1,2,3 ...} that are not
							enabled for the cycle. Enable the relevant tags in the Cycle
							Configuration window. | 
					
					
						| SC165 | 
						Check whether multiple MI records
							using the same measure/module are set to enabled for the same cycle. In
							this situation, the MI records are invalid and are not created at the
							start of a cycle period. | 
						Warning | 
						Cycle has more than one enabled
							Market Intelligence record for module "{0}" using the same measure "{1}
						 | 
					
					
						| SC166 | 
						Check whether multiple enabled MI
							records with the same Net Forecast Measure are set to Edit Net Forecast
							Directly. The Net Forecast Measure can only be edited directly in one MI
							record. In this situation, the MI records are invalid and are not
							created at the start of a cycle period. | 
						Warning  | 
						Cycle has more than one enabled
							Market Intelligence record for module "{0}" using the same Net Forecast
							Measure "{1} set to Edit Net Forecast Directly. | 
					
					
						| SC168 | 
						Check whether a calculation rule is
							based on a measure which is defined as a Market Intelligence record. In
							this situation, the calculation rule is invalid and is not created a the
							start of a cycle period. | 
						Warning  | 
						Cycle has an enabled Calculation rule
							{0} which is based on a measure {1} that is defined as a Market
							Intelligence record. Update the Calculation rule accordingly. | 
					
					
						| SC169 | 
						Check whether a calculation rule is
							based on a measure which is defined as a Transactional Data record and
							both are enabled for the same cycle. In this situation, the calculation
							rule is invalid and is not created at the start of a cycle
							period. | 
						Warning  | 
						Cycle has an enabled Calculation rule
							{0} which is based on a measure {1} that is defined as a Transactional
							Data record. Update the Calculation rule accordingly. | 
					
					
						| SC170 | 
						Check whether a measure is defined as
							a Transactional Data record and is enabled in a cycle, which also is
							defined as a Market Intelligence record and enabled for the same cycle.
							In this situation, the measure is invalid and the configuration cannot
							be completed. | 
						Incomplete | 
						Cycle has an enabled measure {0}
							which is defined as a Transactional Data record and a Market
							Intelligence record. Measure can only be used in one definition. | 
					
					
						| SC176 | 
						If a Replenishment Engine is defined,
							check that the engine is enabled for the cycle. If the engine is not
							enabled, the engine is not available for selection for the
							cycle. | 
						Warning | 
						Cycle has a Replenishment Engine {0}
							which is not enabled for the cycle. |