Add maximum production for a process
Additional enhancements have been made to allow setting maximum production for a process
for a range of periods and publish specific period overrides back to SCV, for importing to
future cycle periods or plans.
These interfaces are added:
- SPLS - SCV -Export Values SM_ROUTING_BUCKETS
- SPLS - SCV -Import Processes Calendar
The SPLS_PRODUCTION_MAX_SUM (with sequence 110970) calculation rule is modified to incorporate period overrides where defined; otherwise use the static default.
This feature is enabled after appending the supply planning template (spls.zip) for this version.
Note: Additional role or privilege is not required to access this feature.