Add maximum production for a process

Additional enhancements have been made to allow setting maximum production for a process for a range of periods and publish specific period overrides back to SCV, for importing to future cycle periods or plans.

These interfaces are added:

  • SPLS - SCV -Export Values SM_ROUTING_BUCKETS
  • SPLS - SCV -Import Processes Calendar

The SPLS_PRODUCTION_MAX_SUM (with sequence 110970) calculation rule is modified to incorporate period overrides where defined; otherwise use the static default.

This feature is enabled after appending the supply planning template (spls.zip) for this version.

Note: Additional role or privilege is not required to access this feature.