Example 3 - Opening stock above ROP
This topic describes the process of defining an item, location based on ROP schedule
logic when the available stock is zero.
The Pre-requisites for this scenario:
The Calculate Schedules input values for the Macro or worksheet:
- Order Start Offset: “” (macro) or 0 (macro or worksheet)
- Requirements horizon: “” (macro) or 365 (worksheet)
Global inputs (cycle period and engine call values):
- Current Planning Period: FY16 M07 (2016-06-27 – 2016-07-24)
- Start_date: 2016-06-27 (Current Planning Period's Start Date)
- Cycle Future Horizon: 52 weeks
- End_date: 2017-06-27 (Current Planning Period's Start Date + Cycle Future Horizon in days)
Item code: 10140
Location code: F1
Measure mapping inputs:
- Default Source Method: 1 (Transfer)
- Opening stock: 200
- Reorder Point (ROP): 100
- Receiving calendar ID: 1
- Freeze Period: 7
- Lead Time (Transfer): 7
- Minimum Lot Quantity (Transfer): 100
- Increment (Transfer): 20
ROP schedule logic
- If the Opening Stock is not less than ROP, planned order is not required.
- If mapped, set output measure ‘Schedule Last Calculated’ = current date & time.