Example 5 - No valid receiving day
This topic describes the process of defining an item, location based on ROP schedule
logic when valid receiving day is available.
The Pre-requisites for this scenario:
The Calculate Schedules input values for the Macro or worksheet:
- Order Start Offset: 14 (macro or worksheet)
- Requirements horizon: 28 (worksheet)
Global inputs (cycle period and engine call values):
- Current Planning Period: FY16 M07 (2016-06-27 – 2016-07-24)
- Start_date: 2016-06-27 (Current Planning Period's Start Date)
- End_date: 2017-06-25 (Current Planning Period's Start Date + Cycle Future Horizon in days)
Item code: 10141
Location code: B1
Measure mapping inputs:
- Default Source Method: 1 (Transfer)
- Opening stock: 0
- Reorder Point (ROP): 60
- Receiving calendar ID: 4
- Freeze Period: 7
- Lead Time (Transfer): 7
- Minimum Lot Quantity (Transfer): 10
- Increment (Purchase): 5
ROP schedule logic
If the Opening Stock < ROP, get the corresponding interpolation calendar
from current Engine Settings based on the Measure mapping for Receiving Calendar ID (ID = 4).
The default pattern for the interpolation calendar (First Monday of every month):
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
---|---|---|---|---|---|---|
0 | 1 | 0 | 0 | 0 | 0 | 0 |
Date After | Date Before | Description | Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
---|---|---|---|---|---|---|---|---|---|
2016-07-11 | 2016-07-31 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
2016-08-08 | 2016-08-31 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
2016-09-12 | 2016-09-30 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
2016-10-10 | 2016-10-31 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
2016-11-14 | 2016-11-30 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
2016-12-12 | 2016-12-31 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
For No override pattern for the order receiving dates:
- The first possible order date in the future horizon is calculated as
Start_date + MAX of:
- Order Start Offset = 14
- Lead Time (Purchase) = 7
- Freeze Period = 7
- 2016-06-27 + 14 = 2016-07-11
- Receiving_date = 1st non-zero day in the receiving calendar >=
first_order_date AND <=End_date:
Non-zero days from Start_date Day of week Before or After first_order_date? Before or After End_date? 2016-07-04 Monday BEFORE BEFORE 2016-01-08 Monday AFTER AFTER - If receiving_date is not matching, the planned order is not possible.
- If mapped, set output measure ‘Schedule Last Calculated’ = current date & time.