- 
            Begin to define a periodic inspection schedule. 
		  
         
 
- 
            Under 
			 Recurrence, select 
			 Daily from the 
			 Schedule Type list. 
		  
         
 
- 
            Specify whether the inspection will be scheduled at an interval or
			 on every weekday. 
		  
            
To schedule the inspection at an interval, select Every _ days(s), and type the number of days that you
               want between inspections. For example, if you want the inspection scheduled every
               third day, specify 3. To schedule the inspection daily, Monday through Friday, select
                  Every weekday. 
          
- 
            Specify any other information about the interval. 
            
If you selected Every _
                  day(s), you must specify a date in the Starting Date field to indicate when Infor Public Sector will begin scheduling inspections based on
               this interval. For example, if you specify an interval of 3 and a starting date of
               01/01/2017 (a Sunday), Infor Public Sector will schedule an
               inspection on January 1, January 4 (a Wednesday), January 7 (a Saturday), and so on.
               You can use the "Days in
                  Advance" fields to indicate how far in advance an inspection can be
               scheduled, such as indicating that an inspection must be scheduled between three and
               30 days before it is conducted. 
          
- 
            Click 
			 Save. 
		  
            
Infor Public Sector saves the schedule
               with the interval that you defined. 
          
- 
            Continue to define the periodic inspection schedule.