Begin to define a periodic inspection schedule.
-
Under Recurrence, select Weekly from the Schedule Type list.
-
Specify the interval and the day of the week on which Infor Public Sector can schedule the inspection.
Specify the number of weeks between inspections in the Every _ week(s) on field,
and then select the correct day of the week, such as 2 and Thursday to schedule the inspection every other
Thursday.
-
In the Starting Date field, enter the date on which Infor Public Sector will begin scheduling inspections based on this interval.
-
Enter any other information about the interval.
You can use the Exclude Week check boxes to direct Infor Public Sector not to schedule an inspection during certain weeks. For example, if you select the 2nd check box, Infor Public Sector will not schedule the inspection the second week of the month. You can also use the "Days in Advance" fields to indicate how far in advance an inspection can be scheduled, such as indicating that an inspection must be scheduled between three and 30 days before it is performed.
-
Click Save.
Infor Public Sector saves the schedule that you
defined. You must have entered all required information for the schedule to save
it.
-
Continue to define the periodic inspection schedule.