Select .
-
On the correct asset type tab, under Asset Inspections, click Create Group Inspection Schedule.
-
Specify the correct asset group in the Asset Group field.
-
If the correct asset type isn't displayed, select it from the Asset list.
-
In the Inspection Type field, specify the identification code for the
type of inspections you want to schedule.
-
Under Schedule Information, select an option from the Reschedule By list.
If you select Completion Date,
Infor Public Sector schedules inspections based on
the completion date of the previously generated inspection. If you select this
option, you must wait until each inspection is completed before you can schedule
the next one. If you select Scheduled
Date, Infor Public Sector schedules
inspections based on the scheduled date of the previously generated inspection,
regardless of whether the inspection is completed.
-
Using the Schedule Type list and Interval field, specify the interval between group inspections generated under this schedule.
The schedule type indicates whether Infor Public Sector will schedule the inspections on a daily, weekly, or monthly basis. For example, if you specify Monthly as the schedule type and 3 as the interval, Infor Public Sector will schedule inspections for assets in the asset group every three months until the Cycle To date. Note that Infor Public Sector uses the last day of the month as the scheduled date for monthly schedules.
-
Specify a date in the Next Scheduled field.
This is the scheduled date for the first group inspections
that you generate based on this schedule. Note that the date you select will
determine the scheduled dates of subsequent group inspections. For example,
let's say you set your schedule to generate group inspections every two months
between October 1 and April 30, that you selected Scheduled Date from the Reschedule By list, and that you specified
December 15 as the Next Scheduled
date. If you generate group inspections for this schedule through April 30,
Infor Public Sector will generate group inspections
with scheduled dates of December 15, February 15, and April 15. Note that this
example assumes that you didn't select the End of Month check box and did select the
Weekdays,
Holidays, and
Weekends check
boxes.
-
In the Cycle
From and Cycle
To fields, specify the date range during which you want to
schedule inspections.
Infor Public Sector will schedule no
inspections outside of this date range. If you leave the Cycle From field blank,
Infor Public Sector uses today's date.
-
Under Calculate
Next Scheduled Based on Workday Options Below, select the check
boxes to indicate the types of days on which Infor Public Sector can schedule inspections.
This list describes the results of clicking each check box.
- Weekdays
- Allows Infor Public Sector to schedule inspections on weekdays if
you choose Days as the
schedule type.
- Holidays
- Allows Infor Public Sector to schedule inspections on holidays if
you choose Days as the
schedule type.
- Weekends
- Allows Infor Public Sector to schedule inspections on weekends if
you choose Days as the
schedule type.
- End of Month
- Allows Infor Public Sector to schedule inspections on the last
valid day of the month if you choose Months as the schedule type. What Infor Public Sector considers to be the
last day of the month depends on the other scheduling options
that are selected. For example, if the last day of the month is
a Saturday and the schedule allows weekday but not weekend
scheduling, Infor Public Sector will
schedule inspections for the last Friday of that month.
Note: If
you’re not ready to activate the schedule, you can select Schedule is On-Hold.
Infor Public Sector will not generate
inspections for schedules that have been placed on hold.
-
Click Save.
Infor Public Sector saves the schedule and shows
an identification number and a message that the inspection schedule was
completed successfully. You can click the Group Inspection Schedule # link to view
and edit the schedule in the Group Inspection Schedule InfoViewer.