Editing asset risk event details
When you first calculate an asset's risk, Infor Public Sector uses the values defined for each risk event type that affects the asset, such as the PoF type and the CoF group. If required, you can override these values for selected assets. Infor Public Sector will then use the values defined for the asset rather than the risk event type to calculate risk.
- Open the correct risk event in the Risk Event InfoViewer.
- Click the button in the toolbar.
- Select the Override check box.
- Update the risk information as required.
- Click .