Confirming cancellation of WO operation element (Inspection Tasks)

Work Order (WO) Operation Element type 5 (Quality Inspection)

When a quality inspection of a WO is deleted from M3 and the client clicks the Inspection Tasks tab inside the WO Operation, the client application gets the delete notification with a confirmation prompt. The user is prompted with a message that the inspection task is deleted and all of its transaction are cancelled.

When technician confirms:
  • All inspection transactions in cache is cleared.
  • All inspection tasks are removed from the Inspection Tasks tab.

WO Operation Element type 5 (Safety check)

When a safety check of a WO is deleted from M3, the client application gets the delete notification with a confirmation prompt upon status change or when the Safety check button is clicked. A list of deleted safety checks are displayed and notifies the user that the inspection task is deleted and all of its transaction are cancelled.

When the WO Operation is opened, the user is prompted with a message that the operation and all of its pending transactions are cancelled with the option to confirm.

When technician confirms:
  • All deleted safety checks are removed from the Safety check prompt.
  • When all safety check inspections are deleted, the safety check prompt and the Safety check button are no longer displayed upon status change.A new MTM transaction Delete Operation logs the confirmation of WO Operation deletion.
Note: In EventHub Subscription, MMOOPS M3 table must have a Delete (D) subscribed event for the client app to receive the delete updates from M3.