Confirming cancellation of work order (WO) operation element type 5 (Quality Inspection)

When a quality inspection of a WO is deleted from M3 and the client clicks the Inspection Tasks tab inside the WO Operation, the client application gets the delete notification with a confirmation prompt. The user is prompted with a message that the inspection task is deleted and all of its transaction are cancelled.

When technician confirms:
  • All inspection transactions in cache is cleared.
  • All inspection tasks are removed from the Inspection Tasks tab.
Note: If M3 Mobility Core receives a CREATE event for the same element number, the technician is prompted with a message that a new set of inspection tasks overwrites the previous inspection tasks.