Home
Working on operations
Performing the operation tasks
Cancellation of WO operation element (Inspection Tasks)
Cancellation of WO operation element (Inspection Tasks)
Side TOC
Side TOC
Working on operations
Viewing the dispatched operations
Declining an operation
Reporting material lines
Reporting travel time
Reporting miscellaneous costs
Performing the operation tasks
Reporting inspection tasks through line details screen
Reporting inspection tasks through inline editing
Cancellation of WO operation element (Inspection Tasks)
Confirming cancellation of work order (WO) operation element type 5 (Quality Inspection)
Confirming cancellation of WO operation element type 5 (Safety check)
Capturing start of operation
Recording labor time and defining charges
Capturing work stoppage
Stopping and interrupting the operation
Reporting meter reading through line details screen
Reporting As Built meter reading through line details screen
Reporting meter reading through inline editing
Reporting As Built meter reading through inline editing
Reporting the work
Completing the work
Attaching files for work order
Capturing images
Capturing a video
Printing the M3 order confirmation documents
Printing the M3 work order documents
Printing the M3 invoice specification document
Printing the M3 service report document
Reallocating work to another Field Service Technician
Working offline