Rework Lines
Specific processes can be configured in the application to perform rework. At a rework station, the operator specifies the next operation for the inventory pack after rework is completed.
If a rework station is dedicated to a specific rework operation, a corresponding routing operation must be specified in the routing. The rework operation is configured as optional to ensure that normal production runs do not schedule the rework operation.