Carried over inventory

When a production run ends, loaded inventory packs can be unloaded or carried over for consumption in the next production run. Inventory can be carried over when the material is valid for the next production order and a quantity remains in the inventory pack. The operator must specify the quantity consumed on the first production run when changing orders.

Carrying over inventory is suitable only for certain material types and processes. For example, in a juice manufacturing process, a batch of oranges can continue to be consumed across production runs when the finished product changes to a different container.

To support carried-over inventory, the routing operation for the production run being started must reference the appropriate input material type and specify that the material can be carried over.

Carrying over inventory is supported only with time-based consumption.