Rework Inventory
Rework inventory is inventory created during manufacturing that does not meet quality standards, however, can be corrected through rework. Rework involves repeating previous operations in the routing. For example, inventory can be sent back to a previous operation or directed to additional rework operations, typically on a dedicated rework line or work center.
Rework is supported only when the production model is configured as Inventory in Progress. The rework activity is represented by an additional production run for the same production order on which the inventory pack is created.
These are the steps involved in rework:
- A decision is made that rework is required.
- The inventory is directed to the appropriate location for rework. The rework location can be an operation in the routing or an optional rework operation that is scheduled only when required.
- After rework is completed, the inventory pack is directed to the point in the process where processing must resume. From that point, all operations are executed according to the routing. The standard rework process assumes that all subsequent operations follow the routing.