Moving a production run You can move scheduled production runs to another production line, using the Move Production Order option. To move a production run: Select Home > To Do > Production Orders. The Production Orders screen is displayed. Select a job and click Move Production Order. The Move Production Order window is displayed. Specify this information: Move Scope The level at which the move is performed. Possible values: Job Move: Moves a single production run. Production Order Move: Moves a single production order. Production Order Group Move: Moves a group of production orders. Line The production line to which the production run or production order is moved. Seq of job/campaign The sequence position of the production run or campaign on the destination line. Line Sections The line sections associated with the destination line. Pass Name The pass name of the production run operation. Click OK.