Target tab
You can specify this information:
- Target OEE %
-
The target OEE percentage for the line, expressed as a value between 0-100. If the OEE value is greater than or equal to the target are displayed in green. If the OEE value is within 10% below the target are displayed in amber. If the OEE value is more than 10% below the target are displayed in red.
- Target Availability Loss %
- The target percentage of time a production line is expected to be unavailable, expressed as a value between 0-100.
- Target Setup Time Loss %
- The target percentage of production time to be lost due to setup activities, expressed as a value between 0-100.
- Target Availability %
- The target percentage of time the production line is available for operation, expressed as a value between 0-100.
- Target Quality %
- The target percentage of products meeting quality standards on the production line, expressed as a value between 0-100.
- Target Performance %
- The target percentage efficiency of the production line, expressed as a value between 0-100.
- Target Rework %
- The target percentage of rework for the production line, expressed as a value between 0-100.
- Target Waste %
- The target maximum percentage of waste generated by the production line, expressed as a value between 0-100.
- Target FTTQ %
- The expected percentage of products that pass First Time Through Quality (FTTQ) on the production line, expressed as a value between 0-100.
- Target TEEP %
- The target percentage value for the KPI, expressed as a value between 0-100.
- Target Asset Utilisation %
- The target percentage of asset utilization for the production line, expressed as a value between 0-100.
- Target Equipment Load Ratio %
- The target percentage value for equipment utilization based on the load capacity, expressed as a value between 0-100.
- Target Inventory Isolated %
- The target percentage of isolated inventory, expressed as a value between 0-100.
- Target Setup Ratio %
- The target percentage of time spent on setup activities relative to total production time, expressed as a value between 0-100.
- Target Labour Efficiency %
- The target percentage of labour efficiency, expressed as a value between 0-100.
- Target Allocation Efficiency %
- The target percentage of resource allocation, expressed as a value between 0-100.
- Target Technical Efficiency %
- The target percentage of technical efficiency, expressed as a value between 0-100.
- Target Utilisation Efficiency %
- The target percentage of how effectively resources are utilized during production, expressed as a value between 0-100.
- Target Total Loss %
- The target percentage of total loss during production, expressed as a value between 0-100.
- Target Speed Loss %
- The target percentage of lost production time due to running equipment or processes below the optimal speed, expressed as a value between 0-100.
- Target Waste Loss %
- The target percentage of waste on the production line, expressed as a value between 0-100.
- Rated Production Speed
- The production speed the production line is rated for, expressed in units per second.
- Maximum Production Speed
- The maximum achievable speed of the machine, expressed in units per second. This value is used in calculating the Equipment Load Ratio KPI and in discrete manufacturing.
- Maximum Production Capacity
- The maximum number of units that the production line can produce in a specified time. This value is used in calculating the Equipment Load Ratio KPI and in batch manufacturing.
- Target Production Attainment %
- The target percentage of production attainment, expressed as a value between 0-100.
- Target Production Loss %
- The target percentage of production loss, expressed as a value between 0-100.
- Target Production Loss Area %
- The target percentage of production loss measured as an area, expressed as a value between 0-100.
- Target Production Loss Mass %
- The target percentage of production loss measured as a mass (weight) , expressed as a value between 0-100.
- Target Productivity %
- The target percentage of productivity, expressed as a value between 0-100.
- Target Yield %
- The target percentage of usable output produced relative to the total input materials, expressed as a value between 0-100.
- Target First Pass Yield %
- The target percentage of products that are manufactured correctly and meet quality standards in the first pass, expressed as a value between 0-100.
- Target Yield Area %
- The target percentage of usable output as an area, expressed as a value between 0-100.
- Target Yield Mass %
- The expected percentage of usable output as a mass (weight) , expressed as a value between 0-100.
- Target Count Scrap %
- The target percentage of discarded units relative to the total number of units produced, expressed as a value between 0-100.
- Target Unaccounted Scrap %
- The target percentage of unaccounted scrap, expressed as a value between 0-100.
- Target Total Scrap %
- The target percentage of total scrapped materials relative to the total production, expressed as a value between 0-100.
- Target Technical Downtime Loss %
- The target percentage of production time lost due to technical downtime, expressed as a value between 0-100.
- Target Downtime Loss %
- The target percentage of total production time lost due to all types of downtime, expressed as a value between 0-100.
- Target Downtime %
- The target percentage of total time during which the production line is not operational, expressed as a value between 0-100.
- Target Procedural Downtime Loss %
- The target percentage of production time lost due to procedural downtime, expressed as a value between 0-100.
- Target Quality Downtime Loss %
- The target percentage of production time lost due to quality-related downtime, expressed as a value between 0-100.
- Target Not Run Time %
- The target percentage of total time during which the production line is not running, expressed as a value between 0-100.
- Target Not Run Time Total %
- The expected percentage of total time during which production equipment, lines, or processes are not operational.
- Target Planned Busy Time %
- The target percentage of planned busy time, expressed as a value between 0-100.
- Target Planned Operating Time %
- The target percentage of planned operating time, expressed as a value between 0-100.
- Target Planned Stop Time Loss %
- The target percentage of total scheduled production time lost due to planned stops, expressed as a value between 0-100.
- Target Breakdown Time Loss %
- The target percentage of total production time lost due to equipment breakdowns, expressed as a value between 0-100.
- Target Stop Time %
- The target percentage of total scheduled production time during the line is not operational due to any type of downtime, expressed as a value between 0-100.
- Target Unplanned Stop Time Loss %
- The target percentage of total production time lost due to unplanned downtime, expressed as a value between 0-100.