Modifying a specification limit from date

  1. Select Configuration > Quality > Specification Limits. The Specification Limits screen is displayed.
  2. Select an existing record and click Edit From Date. The Edit From Date window is displayed.
  3. Specify this information:
    Specification Valid From
    The date and time the specification limit is valid from.
  4. Click OK.