Example for lines

Example:

  • Line Type: Coating Lines
  • Process Type: Coating
  • Line: Coating Line 001
  • Short Name: Coating 1
  • Allow Jobs to be stopped: Yes
  • Allow Jobs to be started/changed: No
  • Allow next scheduled Jobs to be started: Yes
  • Changeover
  • Setup Mode: Manual
  • Ramp Up Mode: No
  • Labour: Single line at a time
  • Production Performance
  • Enable Production Report Sweeps: Yes
  • Calculation Methods
  • Base Output Counts on: None
  • Base Input Counts on: Inventory Packs
  • Base Re-Introduction Counts on: None
  • Interval Mode: Hour
  • Area Calculation Method: Reel to Reel
  • Treat Production Loss as Quality Loss for OEE: Yes
  • Adjust Output Counter if they contain scrap counts: Yes
  • Under Consumption Mode: None
  • Receiving Order Generation Mode: Error
  • Previous Job Inventory Overlap: 0
  • Targets
  • Target OEE %: 80
  • Target Availability %: 60
  • Target Quality %: 90
  • Target Performance %: 80
  • Target Rework %: Enter the target rework limit % (out of 100) for the line.Target Waste %: 10
  • Yield
  • Target Yield %: 90
  • Target Yield Area %: 90