Information tab
You can specify this information:
- Hazardous Materials
- The hazard classification of the material.
- Material Group
- The material group of the material used for reporting.
- Material Sub Group
- The sub-group of the material used for the reporting.
- Legacy #
- The legacy number for the material. This is applied when aligning a new material number with one from an old system.
- Rev.
- The revision number linked to the material drawing number.
- Last Purchase Cost
- The last purchase cost of an item.
- Average Purchase Cost
- The average purchase cost of an item.
- Standard Purchase Cost
- The standard cost of an item.
- Standard Sale Cost
- The standard sale cost of an item.
- Standard Manufacture Cost
- The standard manufacture cost of an item.
- Target Yield
- The line yield target, as a percentage between 0 and 100.
- Target Scrap Rate
- The target scrap rate, as a percentage between 0 and 100.