Run scheduling - Schedule information
Note: You must first define the job schedule category and a job schedule function before you can run scheduling.
When a user runs a function that is defined in M3 BE Job Scheduler with scheduling allowed, two new panels are displayed for the user before the job is submitted. These are panels (SHS230/E) and (SHS231). Here, the user decides the times and frequency with which the function is run.
Note: When scheduling a job for the first time, the dates specified in the selection screen are used. It is when the following run is scheduled first in CSCHJOB that the dates are adjusted according to the movement parameter. Programs 'Material Plan. Calculate Regenerative' (RPS999), 'Material Plan. Re-calculate' (MMS999), and 'Product. Re-create Lowest Levels' (PDS910) are not allowed to be scheduled repetitively.
The function will be scheduled to run at the dates, times, and frequency that you specified. The information about when the function is run is stored in CSHHED and CSHDAT.