Continuous Net Change
This field specifies the frequency with which M3 will check the materials planning situation.
Description
The feature is used in special applications of Plant Maintenance.
The valid options are:
0 = In batches, normally each shift
1 = Immediately.
Note: Continuous Net Change should not, in normal circumstances, be used against a piece of equipment, as it would cause work order proposals to be continuously replanned.