Reporting Level
The reporting level indicates where in a project structure the project status notation should be saved.
The reporting level can only be set for main project or subproject elements. If this is done at the subproject level, then the element is treated as a project. In this case, the levels above the subproject are used only for follow-up. This field can only be changed when the project status is 05 (entry).